Permit#: PW1904-034
<br /> Site Address: 2122 106TH ST SW
<br /> Owner: PAUL'S REMODELING LLC
<br /> Tenant: [TenNamej
<br /> App.Date: 4/12/2019
<br /> Proposed Use:
<br /> CITY OF EVERETT Description: SITE WORK FOR NEW SFR
<br /> STANDARD PLAN NOTES
<br /> Required Notes for Erosion/ Sedimentation Control Plans Reviewed By: Date: 4/i3 tzo t'►
<br /> The following standard notes shall be added to construction plan sets and edited as appropriate to the Required Notes for Water Plans Office Set J
<br /> �7ob Site Set Fire/Planning Set
<br /> project. A. No connection to the existing mains will be allowed except by means of an approved
<br /> 1. Approval of this erosion/sedimentation control (ESC) plan does not constitute an approval of backflow prevention device prior to satisfactory flushing, testing, disinfection, and receipt of
<br /> permanent road or drainage designsize and location of roads, pipes, restrictors, channels satisfactory bacteriological test results.
<br /> g g (e.g. P PB. Connections to and taps on existing mains will be made by the Public Works Department at
<br /> retention facilities, utilities). the developer's expense. The Public Works Department shall be given at least 5 business days notice
<br /> 2. The implementation of these ESC plans and the construction, maintenance, replacement, and for each connection. The Public Works Department shall thereafter determine the date and time at
<br /> upgrading of these ESC facilities is the responsibility of the applicant/contractor until all construction which the connection shall be made.
<br /> is completed and approved and vegetation/landscaping is established. C. All work and materials must conform to City of Everett Standards.
<br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field D. A pre-construction meeting shall be held with the City prior to the start of construction. The
<br /> prior to construction. During the construction period, no disturbance beyond the flagged clearing City of Everett Public Works Construction Division must be notified at least 24 hours prior to
<br /> limits shall be permitted. The flagging shall be maintained by the applicant/contractor for the commencement of construction.
<br /> duration of construction. E. The developer or the developer's authorized agent shall notify the Public Works Department
<br /> 4. The ESC facilities shown on this plan must be constructed in conjunction with all clearing and of a person who can be contacted regarding problems during construction on a 24 hour basis.
<br /> grading activities, and in such a manner as to ensure that sediment and sediment laden water do not _
<br /> F. Maintain a minimum of 10 feet horizontal and 18 inches vertical separation between potable a � ; i
<br /> enter the drainage system, roadways, or violate applicable water quality standards. 1
<br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated site
<br /> and non-potable conveyance systems. sms
<br /> conditions. During the construction these ESC facilities shall be upgraded as needed for sw
<br /> G. All City of Everett valves shall be operated by Public Works Department personnel only. All - - T
<br /> period, valves, new and existing, shall be accessible at all times. st
<br /> unexpected storm events and to ensure that sediment and sediment-laden water do not leave the site. d
<br /> 6. The ESC facilities shall be inspected routinely and maintained by the applicant/contractor to 4 d x `4.
<br /> � '
<br /> ensure their continued functioning, especially after storm events. Required Notes for Sanitary Sewer Plans , ,
<br /> The following standard notes are required on all Sanitary Sewer Plans: 3 {
<br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a - 1Q3r°St SW ,�, 4 , �..
<br /> month or within the 48 hours following a major storm event. A. All work and materials shall conform to the City of Everett Standards and WSDOT/APWA titr.* $
<br /> Standard Specifications. 9
<br /> 8. At no time shall more than one foot of sediment be allowed to accumulate within a trapped SW � `
<br /> B. No part of the sanitary sewer system shall be covered, concealed or put into use until it has % p
<br /> catch basin. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning been tested, inspected, and approved by the city inspector. i S I TE'
<br /> operation shall not flush sediment laden water into the downstream system. 1115th St sw - is
<br /> C. Approximate locations of existing utilities have been obtained from available records and are
<br /> 9. Stabilized construction entrances shall be installed at the beginning of construction and m b a°
<br /> g g shown for convenience. The contractor shall be responsible for verification of locations and to avoid
<br /> maintained for the duration of the project. Additional measures may be required to ensure that all n P $4"
<br /> damage to any additional utilities not shown. If conflicts with existing utilities arise during
<br /> paved areas are kept clean for the duration of the project. 1d�, i
<br /> construction, the contractor shall notify the public works inspector and any changes required shall be o+
<br /> 10. The Contractor shall provide periodic street cleaning to remove debris and sediment tracked If
<br /> approved by the City Engineer prior to commencement of related construction on the project. �r -=-----,`�- - — '�` 17th PI
<br /> off the site.
<br /> 1) D. All sewer main extensions within the public right-of-way or in easements must be staked �:2th
<br /> 1_8"
<br /> 11. Appropriate measures shall be taken to stop sediment from entering surface water bodies if the t w. if p.
<br /> proposed BMPs fail. by survey for line and grade prior to starting construction. , S 0
<br /> 12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than 2 days "�
<br /> from October 1 through April 30, and for no more than 7 days from May 1 through September 30. Sample Construction Sequence: 11Zffiyv �` ,
<br /> 1) Call for any utility locates at least two days prior to scheduled preconstruction meeting. srsw A _Laz .,
<br /> 2) Before any construction or development activity, a preconstruction meeting must be held between the
<br /> Required Notes for Storm Drainage Plans City of Everett,the applicant and applicant's construction representative. +" s D`
<br /> 1. No part of the drainage system shall be covered, concealed, or put into use until it has been 3) Flag clearing limits. I. ai
<br /> inspected, tested, and accepted by the City of Everett. 4) Install stabilized construction entrance. ,,1 II '
<br /> 2. All work and material shall conform to the City of Everett Design and Construction Standards 5) Install filter fabric fence as indicated on plan. oost
<br /> 5s
<br /> and Specifications and the WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal 6) Install offsite catch basin protection. ''°
<br /> Construction (Current Edition). 7) Construct sediment trap/pond if applicable. 1; p®
<br /> 8) Clear and rub areas of the: St3Aitltif existing utilities have been obtained from available records and are gshown for convenience. The contractor shall be responsible forverification olocatins and to aoid and check dams if applicable. VICINITY MAP
<br /> damage to any additional utilities shown. If conflicts with existing utilities arise during construction, 10) Rough grade site and install storm conveyance system and retention/detention facilities. Provide inlet 1" 1000'
<br /> the contractor shall notify the Public Works Inspector and any changes required shall be approved by protection where indicated.
<br /> the City Engineer prior to commencement of related construction on the project. 11) Install remaining utilities and building.
<br /> 4. All storm systems within the public right-of-way or in easements must be staked by survey for 12) Finish grade site and construct asphalt parking areas, access drives, sidewalks, curbs and gutters.
<br /> 13) Complete site stabilization in accordance with landscape plans.
<br /> line and grade prior to starting construction. 14) Clean storm drainage system, on and off site, of all sediment and debris.
<br /> 5. All catch basin grates must be stenciled or stamped "Dump No Waste, Drains to Stream, Lake, 15) Remove temporary erosion control facilities when site is completely stabilized.
<br /> River, Puget Sound, or Wetland." Choose appropriate feature for the project. APPROVED
<br /> PUBLIC WOR S DEPAR MENT
<br /> BY
<br /> DATE df/15J2e/?
<br /> CITY OF EVERETTRRREVIE ED FOR PERMIT
<br /> 1%14/96 4-6 34
<br /> TABLE OF CONTENTS
<br /> Cl COVER SHEET/ NOTES
<br /> C2 TESC PLAN
<br /> C3 DRAINAGE SITE PLAN
<br /> Dovcialvuk SFR -- Revisions:
<br /> ® Site Address: 2122106th St SW
<br /> Jurisdiction: EverettAlialligNIIIIIIM -- C 1
<br /> Parcel No.: 00535400003600 Interlaken Engineering and Design, PLLC
<br /> Applicant: Paul's Remodeling LLC Seattle, WA (206) 470-9572 Cover Sheet
<br /> Know"ham below. Permit rm No.: C1810-016
<br /> I� 9 g����X01'8 d Interlaken Project No.: SEA-19-011 vvvvvv.interlakenen ineerin .com Scale: Not to Scale