My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 b) Chips derived from recycling of clean dimensional lumber (e.g. <br /> 2 pallets or framing lumber)that has passed through a metal removal <br /> 3 process to meet the 1/2% manufactured inert standard above <br /> 4 <br /> 5 8-02.2(9-14.5(4)).DOCX <br /> 6 Wood Strand Mulch <br /> 7 The last paragraph of Section 9-14.5(4) is revised to read: <br /> 8 <br /> 9 8-02.2(9-14.5(4)).OPT1.DOCX ' <br /> 10 (******) <br /> 11 The Contractor shall provide a test report performed in accordance with ' <br /> 12 WSDOT T 125 demonstrating compliance to this Specification prior to <br /> 13 acceptance. This product shall not be harmful to plants, animals, and <br /> 14 aquatic life. <br /> 15 <br /> 16 8-02.2(9-14.5(7)).DOCX <br /> 17 Tackifier <br /> 18 The first paragraph of Section 9-14.5(7) is supplemented with the following: <br /> 19 <br /> 20 8-02.2(9-14.5(7)).OPT1.DOCX <br /> 21 (******) <br /> 22 Tackifiers shall include a mulch tracer added to visible aid uniform <br /> 23 application, and shall not be harmful to plants, animals, or aquatic life. <br /> 24 <br /> 25 8-02.2(9-14.5(7)),INST2.DOCX <br /> 26 The first sentence of the second paragraph of Section 9-14.5(7) is revised to I <br /> 27 read: <br /> 28 <br /> 29 8-02.2(9-14.5(7)).OPT2.DOCX <br /> 30 (******) <br /> 31 The Contractor shall provide test results documenting the tackifier and <br /> 32 mulch tracer meets the requirements for Acute Toxicity, Solvents, and <br /> 33 Heavy Metals as required in Table 1 in Section 9-14.5(2). <br /> 34 <br /> 35 8-02.2(9-14.5(8)).GR8 <br /> 36 Compost <br /> 37 Section 9-14.5(8) is supplemented with the following: <br /> 38 <br /> 39 8-02.2(9-14.5(8)).OPT1.DOCX <br /> 40 (******) <br /> 41 Quality. Compost production and quality shall comply with Chapter 173-350 <br /> 42 WAC, and shall be the result of the biological degradation and <br /> 43 transformation of feedstocks as specified below, under controlled conditions 1 <br /> 44 designed to promote aerobic decomposition, per WAC 173-350-220, which <br /> 45 is available at http://apes.leq.wa.qov/wac/default.aspx?cite=173-350-220. <br /> 46 , <br /> 1 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 98 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.