My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT, WASHINGTON <br /> CONTRACT PROVISIONS FOR <br /> W.O. #3693 <br /> FEDERAL AID#BHM-2776(008) <br /> INSTRUCTIONS TO BIDDERS <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention of Gael L. Fisk, <br /> (425) 257—8909 or gfisk@everettwa.gov. <br /> 2.0 Bidder's Check List <br /> The bidder's attention is directed to the following City-provided forms which must be executed in full as <br /> required and submitted with the bid: <br /> 1. Proposal: The lump sum and unit price items must be shown in the space provided. Show unit prices <br /> in figures. <br /> 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Subcontractor List: To be filled in by the Bidder. <br /> 4. Local Agency Disadvantaged Business Enterprise Utilization Certification <br /> (DOT Form 272-056): To be filled in and signed by the bidder(if DBE goal is assigned.) <br /> 5. Local Agency Disadvantaged Business Enterprise (DBE) Written Confirmation Document (DOT Form <br /> 422-031): To be filled in and signed by DBEs (if DBE goal is assigned.) <br /> 6. Non-Collusion Declaration: To be submitted with the bid. <br /> 7. Bid Bond: This form is to be executed by the Bidder and the surety company unless bid is accompanied <br /> by a certified check. The amount of this bond shall be not less than five percent (5%) of the total <br /> amount bid and may be shown in dollars or on a percentage basis. Cash will not be accepted. <br /> Failure to complete the aforementioned forms and to submit said forms with the bid may be due cause for <br /> rejection of bid. <br /> 3.0 Pre-Award Forms <br /> The following form is required to be signed and submitted prior to award of Contract: <br /> 1. Certification of Compliance with Wage Payment Statutes: To be filled in and signed. This certification <br /> is not required to be submitted with the bid proposal and may be submitted after bid opening. The <br /> Contract cannot be awarded without this certification. <br /> 4.0 Contract Forms <br /> The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful bidder in duplicate within twenty(20)calendar <br /> days after the award date. <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 1 OF 2 INSTRUCTIONS TO BIDDERS <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.