My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 <br /> 2 12. The Contractor shall carry out such sanctions and penalties for violation of these <br /> I <br /> 3 specifications and of the Equal Opportunity Clause, including suspensions, <br /> 4 terminations and cancellations of existing subcontracts as may be imposed or <br /> 5 ordered pursuant to Executive Order 11246, as amended, and its implementing <br /> I <br /> 6 7 regulations by the Office of Federal Contract Compliance Programs. Any Contractor <br /> who fails to carry out such sanctions and penalties shall be in violation of these <br /> 8 specifications and Executive Order 11246, as amended. <br /> I 9 <br /> 10 13. The Contractor, in fulfilling its obligations under these specifications, shall implement <br /> 11 specific affirmative action steps, at least as extensive as those standards prescribed <br /> 12 in paragraph 7 of this Special Provision, so as to achieve maximum results from its <br /> I13 efforts to ensure equal employment opportunity. If the Contractor fails to comply with <br /> 14 the requirements of the Executive Order, the implementing regulations, or these <br /> 15 specifications, the Director shall proceed in accordance with 41 CFR 60-4.8. <br /> I 16 <br /> 17 14. The Contractor shall designate a responsible official to monitor all employment <br /> 18 related activity to ensure that the company EEO policy is being carried out, to submit <br /> I 19 reports relating to the provisions hereof as may be required by the government and <br /> 20 to keep records. Records shall at least include, for each employee, their name, <br /> 21 address, telephone numbers, construction trade, union affiliation if any, employee <br /> I <br /> 22 23 identification number when assigned, social security number, race, sex, status (e.g., <br /> mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours <br /> 24 worked per week in the indicated trade, rate of pay, and locations at which the work <br /> I <br /> 25 26 was performed. Records shall be maintained in an easily understandable and <br /> retrievable form; however, to the degree that existing records satisfy this requirement, <br /> 27 the Contractors will not be required to maintain separate records. <br /> 28 <br /> I29 15. Nothing herein provided shall be construed as a limitation upon the application of <br /> 30 other laws which establish different standards of compliance or upon the application <br /> 31 of requirements for the hiring of local or other area residents (e.g., those under the <br /> 132 Public Works Employment Act of 1977 and the Community Development Block Grant <br /> 33 Program). <br /> 34 <br /> I 35 16. Additional assistance for Federal Construction Contractors on contracts <br /> 36 administered by Washington State Department of Transportation or by Local <br /> 37 Agencies may be found at: <br /> I 38 <br /> 39 Washington State Dept. of Transportation <br /> 40 Office of Equal Opportunity <br /> 41 PO Box 47314 <br /> I42 310 Maple Park Ave. SE <br /> 43 Olympia WA <br /> 44 98504-7314 <br /> I 45 Ph: 360-705-7090 <br /> 46 Fax: 360-705-6801 <br /> 47 http://www.wsdot.wa.gov/equalopportunity/default.htm <br /> I48 <br /> I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 35 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.