Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Submission of the UDBE Utilization Certification, supporting UDBE Written <br /> 2 Confirmation Document(s) showing the Bidder has obtained enough UDBE <br /> 3 participation to meet or exceed the UDBE COA Goal, the UDBE Bid Item I <br /> 4 Breakdown and the UDBE Trucking Credit Form, if applicable. <br /> 5 <br /> 6 2. By documentation that the Bidder made adequate GFE to meet the UDBE 1 <br /> 7 COA Goal <br /> 8 The Bidder may demonstrate a GFE in whole or part through GFE <br /> 9 documentation ONLY IN THE EVENT a Bidder's efforts to solicit sufficient <br /> 10 UDBE participation have been unsuccessful. The Bidder must supply GFE <br /> 11 documentation in addition to the UDBE Utilization Certification, supporting <br /> 12 UDBE Written Confirmation Document(s), the UDBE Bid Item Breakdown <br /> 13 form and the UDBE Trucking Credit Form, if applicable. <br /> 14 <br /> 15 Note: In the case where a Bidder is awarded the contract based on <br /> 16 demonstrating adequate GFE, the advertised UDBE COA Goal will not I <br /> 17 be reduced. The Bidder shall demonstrate a GFE during the life of the <br /> 18 Contract to attain the advertised UDBE COA Goal. <br /> 19 I 20 GFE documentation, the UDBE Bid Item Breakdown form, and the UDBE Trucking <br /> 21 Credit Form, if applicable, shall be submitted as specified in Section 1-02.9. <br /> 22 I 23 The Contracting Agency will review the GFE documentation and will determine if the <br /> 24 Bidder made an adequate good faith effort. <br /> 25 <br /> 26 Good Faith Effort (GFE) Documentation <br /> 27 GFE is evaluated when: <br /> 28 <br /> 29 1. Determining award of a Contract that has COA goal, <br /> 30 <br /> 31 2. When a COA UDBE is terminated and substitution is required, and <br /> 32 I 33 3. Prior to Physical Completion when determining whether the Contractor has <br /> 34 satisfied its UDBE commitments. <br /> 35 <br /> 36 49 CFR Part 26, Appendix A is intended as general guidance and does not, in itself, <br /> 37 demonstrate adequate good faith efforts. The following is a list of types of actions, <br /> 38 which would be considered as part of the Bidder's GFE to achieve UDBE I <br /> 39 participation. It is not intended to be a mandatory checklist, nor is it intended to be <br /> 40 exclusive or exhaustive. Other factors or types of efforts may be relevant in <br /> 41 appropriate cases. <br /> 42 <br /> 43 1. Soliciting through all reasonable and available means (e.g. attendance at <br /> 44 pre-bid meetings, advertising and/or written notices) the interest of all <br /> 45 certified UDBEs who have the capability to perform the Work of the I <br /> 46 Contract. The Bidder must solicit this interest within sufficient time to allow <br /> 47 the UDBEs to respond to the solicitation. The Bidder must determine with <br /> 48 certainty if the UDBEs are interested by taking appropriate steps to follow <br /> 49 up initial solicitations. <br /> 50 <br /> 51 2. Selecting portions of the Work to be performed by UDBEs in order to I <br /> 52 increase the likelihood that the UDBE COA Goal will be achieved. This <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 42 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />