Laserfiche WebLink
1 trucks owned and leased by the DBE must be exclusively employed by <br /> 2 the DBE and reflected on the DBE's payroll. <br /> 3 i 4 • Lease agreements for trucks shall indicate that the DBE has exclusive <br /> 5 use of and control over the truck(s). This does not preclude the leased <br /> 6 truck from working for others provided it is with the consent of the DBE I <br /> 7 and the lease provides the DBE absolute priority for use of the leased <br /> 8 truck. <br /> 9 I 10 • Leased trucks shall display the name and identification number of the <br /> 11 DBE. <br /> 12 <br /> 13 UDBE/DBE/FSBE Truck Unit Listing Log <br /> 14 In addition to the subcontracting requirements of Section 1-08.1, each DBE <br /> 15 trucking firm shall submit supplemental information consisting of a completed <br /> 16 Primary UDBE/DBE/FSBE Truck Unit Listing Log (WSDOT Form 350-077), copy I <br /> 17 of vehicle registrations, and all Rental/Lease agreements (if applicable). The <br /> 18 supplemental information shall be submitted to the Engineer prior to any trucking <br /> 19 services being performed for DBE credit. Incomplete or incorrect supplemental I <br /> 20 information will be returned for correction. The corrected Primary <br /> 21 UDBE/DBE/FSBE Truck Unit Listing Log and any Updated Primary <br /> 22 UDBE/DBE/FSBE Truck Unit Listing Logs shall be submitted and accepted by I <br /> 23 the Engineer no later than ten calendar days of utilizing applicable trucks. <br /> 24 Failure to submit or update the DBE Truck Unit Listing Log may result in trucks <br /> 25 not being credited as DBE participation. <br /> 26 <br /> 27 Each DBE trucking firm shall complete a Daily UDBE/DBE/FSBE Trucking Unit <br /> 28 Listing Log for each day that the DBE performs trucking services for DBE credit. <br /> 29 The Daily UDBE/DBE/FSBE Trucking Unit Listing Log forms shall be submitted I <br /> 30 to the Engineer by Friday of the week after the work was performed. <br /> 31 <br /> 32 Joint Checking I <br /> 33 A joint check is a check between a Subcontractor and the Contractor to the <br /> 34 supplier of materials/supplies. The check is issued by the Contractor as payer <br /> 35 to the Subcontractor and the material supplier jointly for items to be incorporated I <br /> 36 into the project. The DBE must release the check to the supplier, while the <br /> 37 Contractor acts solely as the guarantor. <br /> 38 I 39 A joint check agreement must be approved by the Engineer and requested by <br /> 40 the DBE involved using the DBE Joint Check Request Form (form # 272-053) <br /> 41 prior to its use. The form must accompany the DBE Joint Check Agreement 1 <br /> 42 between the parties involved, including the conditions of the arrangement and <br /> 43 expected use of the joint checks. <br /> 44 <br /> 45 The approval to use joint checks and the use will be closely monitored by the I <br /> 46 Engineer. To receive DBE credit for performing a CUF with respect to obtaining <br /> 47 materials and supplies, a DBE must "be responsible for negotiating price, <br /> 48 determining quality and quantity, ordering the material, installing and paying for I <br /> 49 the material itself." The Contractor shall submit DBE Joint Check Request Form <br /> 50 for the Engineer approval prior to using a joint check. <br /> 51 I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 46 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> 1 <br />