My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 such dollar amounts are to become a part of Contractor's total bid. However, the <br /> 2 Contracting Agency does not warrant expressly or by implication, that the actual amount <br /> I 3 of work will correspond with those estimates. Payment will be made on the basis of the <br /> 4 amount of work actually authorized by Engineer. <br /> 5 <br /> I 6 1-09.9(Payments).RTF <br /> 7 1-09.9 Payments <br /> 8 (March 13, 2012 APWA GSP) <br /> I 9 <br /> 10 Delete the first four paragraphs and replace them with the following: <br /> 11 <br /> I 12 The basis of payment will be the actual quantities of Work performed according to the <br /> 13 Contract and as specified for payment. <br /> 14 <br /> 111 15 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 16 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 17 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 18 include a basis for incremental payments as part of the respective Specification. Absent <br /> 19 a lump sum breakdown, the Project Engineer will make a determination based on <br /> 20 information available. The Project Engineer's determination of the cost of work shall be <br /> I 21 final. <br /> 22 <br /> 23 Progress payments for completed work and material on hand will be based upon <br /> 24 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 25 established at the preconstruction conference. <br /> 26 <br /> 27 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 28 commences the work, and successive progress estimates will be made every month <br /> 29 thereafter until the Completion Date. Progress estimates made during progress of the <br /> I 30 work are tentative, and made only for the purpose of determining progress payments. <br /> 31 The progress estimates are subject to change at any time prior to the calculation of the <br /> 32 final payment. <br /> I 33 <br /> 34 The value of the progress estimate will be the sum of the following: <br /> 35 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> I36 work completed multiplied by the unit price. <br /> 37 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 38 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> I39 determination. <br /> 40 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 41 or other storage area approved by the Engineer. <br /> 42 4. Change Orders — entitlement for approved extra cost or completed extra work as <br /> 43 determined by the Engineer. <br /> 44 <br /> I45 Progress payments will be made in accordance with the progress estimate less: <br /> 46 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects, <br /> 111 47 2. The amount of progress payments previously made; and <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 67 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.