Laserfiche WebLink
1 I NTRO.RTF.DOCX <br /> 2 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 3 <br /> 4 (August 14, 2013 APWA GSP) <br /> 5 <br /> 6 The work on this project shall be accomplished in accordance with the Standard Specifications <br /> 7 for Road, Bridge and Municipal Construction, 2020 edition, as issued by the Washington State <br /> 8 Department of Transportation (WSDOT) and the American Public Works Association (APWA), <br /> 9 Washington State Chapter (hereafter "Standard Specifications"). The Standard <br /> 10 Specifications, as modified or supplemented by the Amendments to the Standard <br /> 11 Specifications and these Special Provisions, all of which are made a part of the Contract <br /> 12 Documents, shall govern all of the Work. <br /> I 13 <br /> 14 These Special Provisions are made up of both General Special Provisions (GSPs) from <br /> 15 various sources, which may have project-specific fill-ins; and project-specific Special <br /> 16 Provisions. Each Provision either supplements, modifies, or replaces the comparable <br /> 17 Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition <br /> 18 to any subsection or portion of the Standard Specifications is meant to pertain only to that <br /> 19 particular portion of the section, and in no way should it be interpreted that the balance of the <br /> 20 section does not apply. <br /> 21 <br /> 22 The project-specific Special Provisions are not labeled as such. The GSPs are labeled under <br /> 23 the headers of each GSP, with the effective date of the GSP and its source. For example: <br /> 24 <br /> 25 (March 8, 2013 APWA GSP) <br /> 26 (April 1, 2013 WSDOT GSP) <br /> 27 (May 1, 2013 City of Everett GSP) <br /> 28 <br /> 29 Also incorporated into the Contract Documents by reference are. <br /> 30 • Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted <br /> 31 edition, with Washington State modifications, if any <br /> 32 • Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current <br /> 33 edition <br /> 34 • City of Everett Design and Construction Standards, current edition <br /> 35 <br /> 36 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> 37 <br /> 38 <br /> 39 DIVISION1.GR1 <br /> 40 Division 1 <br /> 41 General Requirements <br /> 42 <br /> 43 DESWORK.GR1 <br /> 44 DESCRIPTION OF WORK <br /> 45 <br /> 46 DESWORK1.FR1.DOCX <br /> 47 (March 13, 1995) <br /> 48 This Contract provides for the improvement of *** the Maple Heights Bridge, including <br /> 49 installation of new catcher block and girder stops at the abutments, expansion joint at the west <br /> 50 approach of the bridge, rock slope protection at under the west end of the bridge, and bridge <br /> 111 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 1 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> I <br />