My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 damaging the existing steel reinforcing bars. All damage caused by the <br /> 2 Contractor's operations shall be repaired by the Contractor at no cost to the <br /> I <br /> 3 Contracting Agency and the repair shall be as approved by the Engineer. <br /> 4 <br /> 5 Steel reinforcing bars shall be set into the holes noted in the Plans with epoxy <br /> I <br /> 6 resin. The holes shall be cleaned before placing the resin. <br /> 7 <br /> 8 The Contractor shall demonstrate, to the satisfaction of the Engineer, that the <br /> 9 method used for setting the steel reinforcing bars completely fills the void <br /> I10 between the steel reinforcing bar and the concrete with epoxy resin. Dams shall <br /> 11 be placed at the front of the holes to confine the epoxy and shall not be removed <br /> 12 until the epoxy has cured in the hole. <br /> I 13 <br /> 14 6-02.4.G R6 <br /> 15 Measurement <br /> I 16 <br /> 17 6-02.4.INST1.GR6 <br /> 18 Section 6-02.4 is supplemented with the following: <br /> I 19 <br /> 20 6-02.4.0PT26.GB6 <br /> 21 (June 26, 2000) <br /> I 22 Modify bridge drain will be measured per each for each bridge drain modified. <br /> 23 <br /> 24 6-02.4.0PT44.FB6.DOCX <br /> 25 (April 6, 2015) <br /> I26 Seismic retrofit contains the following approximate quantities of materials and work: <br /> 27 <br /> 28 ** <br /> I <br /> 29 Holes Drilled into Existing Concrete 168 EA. <br /> 30 Concrete Cl 4000 12 C.Y. <br /> 31 St. Reinf. Bar 1877 LB <br /> I 32 *** <br /> 33 <br /> 34 The quantities are listed only for the convenience of the Contractor in determining the <br /> I 35 volume of work involved and are not guaranteed to be accurate. The prospective bidders <br /> 36 shall verify these quantities before submitting a bid. No adjustments other than for <br /> 37 approved changes will be made in the lump sum contract price for "Seismic Retrofit - <br /> 38 " even though the actual quantities required may deviate from those listed. <br /> I 39 <br /> 40 6-02.5.GR6 <br /> 41 Payment <br /> 111 42 <br /> 43 6-02.5.INST4.GR6 <br /> 44 Section 6-02.5 is supplemented with the following: <br /> I 45 <br /> 46 6-02.5.0PT72.GB6 <br /> 47 (April 6, 2015) <br /> I 48 "Seismic Retrofit - ", lump sum. <br /> 49 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 91 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.