Laserfiche WebLink
�� <br /> ,-----�, �' <br /> "�, <br /> ����I � / l�i�i� �����Vi�� I'-10 I/2" ��'�.`s� � <br /> �i��:�3.t 1`L= <br /> 1�LR �00� ISG <br /> �� ���,� � � <br /> GENER�L NOT�S: <br /> � 2x TOP PLATE � <br /> SE� PLANS TO DETERMINE THE Dt��ERENT DE5IGNATORS FOR SHEAR WALL MATERIALS, -'-' NAIL SF+EATHING TO <br /> NAILIN6, ANGHOR BOLTS, AND HOLDOWNS. LOGATE HOLDOWNS A5 GLOSE AS P0551BLE TO THE END H�e+2 : : � HEADER o 2° o.c. e.w. , <br /> �:A�;' t�E;��;�_��t��'��ii <br /> OP THE DESIGNATED WALL. ex-r�ND To . � <br /> eNn wa.�Ls �1;r11 i��e�4�':�w�:-i::�i�:�;'��N <br /> ALL HOLDOWNS, P�NGHOR BOLTS, WA5HER5, d NAILS IN GONTAGT WITH P.T. WOOD TO BE <br /> HOT DIPPED 6ALVANIZED. L sx sTUDs orz C�J 2x ���`�� <br /> PI = ONE SIDE PLYWOOD ;� I, � <br /> P2 = TWO SIDES PLYWOOD � <br /> •� �• <br /> NAIL SPAGING SILL BASE HEM FIR #2 �/� <br /> �f/I6" TOP 4 BTM. A35 BLKG. '( �� GONNEGT PLYWOO� V,� <br /> MARK , PLATE PLATE VALUE W/bd NAILS m 2� o.c. <br /> PLYWD. EDGES PIELD �'LATES ANGHORS REQD. q�yGHOR BOLTS NAILING (#/�P) ;� . so ��Ds,PLATES BOTH SIDES <br /> PI-6" 8d 6" 12" 6" 18" O.G. 2x4 5/8° � 48° (2) Ibd � 10" 240 '� �' P,Pa �.,�D s++r�. ' � <br /> . •I �b" MIN. 24/o EXP. I .. . <br /> PI-4" 8d 4" 12" 4" 16" O.G. 2x4 5/8" � 32" (2) i6d � �" 34q r � <br /> �I � STFi�l4 V'IOOD , //�1 \ / � . <br /> PI-3" '�* 8d 3" 12" 3" 14" O.G. 3x4 5/8" � 24° (2) Ibd � 5" 450 ' TO GONGRETE v•i <br /> GONNEGTORS OR `r <br /> PI-2" '* 8d 2" 12" 2" 12" O.G. 3x4 3/4" � 24" (2) Ibd � 5" 585 Cs) �4 VERTIGLtLS �.�I I�:� E�� ��''`qi <br /> I - 3x PLATE � W ^ <br /> P2-6" '�* 8d 6" 12" 6" 10" O.G. 3x4 5/8" � 24" (2) Ibd � 5" 480 NAIL SHEATi-#ING L <br /> �4 I-iORIZ. � TO EAGH PLATE <br /> 12" o.c. • • � . <br /> p2-4" '""� 8d 4" 12" 4" 8" O.G. 3x4 3/4" � 20" (3) Ibd � 5" �00 3/4"�x io���..8. � � � <br /> � �l^V 3'X3"XI/4" � \ a ' � U <br /> GONG. PLATE N1A9F�IER � l 1 � <br /> P2-3" "'� 8d �" 12" 3" 8" O.G. 3x4 3/4" '� I6" (4) Ibd � 5�� �IOO STEM �� � "�o' h,,.,� '� <br /> �.LL I I I � � � <br /> P2-2" *'� 8d 2" 12" 2" S" O.G. 3x4 3/4" � 12" (4) Ibd � 4" II�iO O � <br /> �I-1 Uj � N � • - <br /> *"NOTE: WALLS WITH UNIT SH�AR O� 350#/ft. OR GREATER SHALL HAYE FRAMING � � <br /> MEMBEf25 (STUDS 8 PLATES) ABUTTING PANELS NOT LE55 THAN 3X MEMBERS � � <br /> � <br /> PER IBG 200a, TABLE 2306.3.1. 3X �RAMING WILL BE NOTED ON PLAN. coNr. FooTiN� ° <br /> o� � o � <br /> ELEI(ATION �/I�l^l �..{ /� � � � <br /> I. USE POINER-DRIV�N STEEL STUDS AND NAILS BY HILTY OR RAMSET WHERE APPLIGf�BLE. oUTSInE oF � <br /> 2. PLYWOOD MAY BE INSTALL�D EITHER HORIZONTALLY OR VERTIGALLY. GARAGE GARAC�� � <br /> 3. SOLID BLOGK WITH JOIST UNDER INTERIOR SHEAR WALLS. Doo� � <br /> � � � <br /> SHEA�R WALL i�OTES = � � <br /> w <br /> H <br /> �/I6" 05B OR i'LYWOOD SHEATHING - USE 8d GOMMON OR GALVANtZED NAILS. BLOGK ALL PANEL IHsln� o� '�' <br /> EDGES. LONG DIMENSIONS OF PLYWOOD MAY BE INSTALL�D VERTIGf�LLY. NAIL � 12" O.G. TO f�LL G��`G� <br /> INTERMEDIATE 5TUD5. WHERE 3" NAIL SPf�GIN6 f5 SPEGIFIED f�T PANEL �DGES, U5E I-I/2" 8d PLAN �/IEW oP - <br /> SHORT NAILS OR 3X STUDS WITH 8d GOMMON NAILS. FOR 2" NAIL SPAGING, USE 3X STlJDS GONGRETE S'T�M 1^1P.LL <br /> AND 5TA6GER PANELS. WHERE F'LYWOOD IS 2 51DE5 OP 1^IaLL, JOINTS TO PALL ON <br /> SEPARATE 5TUD5 ON EAGH 51DE. <br /> �LOOR PLYWODD - U5E 8d GOMMON NAILS � 10" O.G. AT INTERMEDIATE SUf'PORTS, 6" O.G. � L?.T�R?.L R�STi�P.I NT P.4N�L <br /> AT ALL PANEL ED6E5 AND 4" O.G. AT ALL SHEA�R YJALLS, UNLE55 OTHERWISE SHOWN ON PLANS. L-I SEE 6�NE}?AL 1�1OT�5 iV0 SGAL� (� <br /> Vi <br /> �LOOR J015T5 - J015T PARRALLEL TO PLOOR OPENIN65 AND EXTERIOR Y`lALLS SHALL BE � <br /> GROSS BLOGKED AT 48" O.G. � EDGES iN/ (4) IOd NAILS FOR THE FIRST BAY. <br /> 3" x 3" x I/4" SQUARE WA5HER5 AT ALL ANGHOR BOLTS. � <br /> 7/16" OSB OR PLYWOOD SHEATHING - STAPLE SGHEDULE O <br /> ALLOWABLE SHEftR �lALUES WITH HEM FIR #2 STUDS <br /> � <br /> 2" ib GA. STAPLES � 15 6A. STAPLES � 14 6A. STAPLES � ,n <br /> 3" O.G. - 280 #/ft. 4" O.G. - 280#/ft. 4" O.G. - 303#/ft. � VI <br /> 2° O.G. - 360#/ ft. 2-I/2" O.G. - 430#/ft. 3" O.G. - 3G0#/ft. 'n . <br /> 4" O.G. AND IOd NAILS 2 O.G. - 504#/ft. <br /> u Z ai� <br /> � 6" O.G. - 620#/ft. <br /> �IELD SPAGING: 12" O.G. NAILS 8 STAPLES. � � <br /> � � <br /> HOLDOWNS - INSTALL 51MPSON HOLDOWNS OR EQUIVALENT AT THE END OF SHEAR WALLS "' <br /> WHEN SHOWN ON DRAWINGS. TO ftTTAGH USE 2X OR 3X HP #2 GONSTRUGTION 6RADE5 AS � „� <br /> SHEAR WALL BOUNDARY �LEMENTS. HOLDOWNS ARE ONLY REQUIRED WNERE SHOWN ON PLANS. <br /> N� � <br /> � <br /> � <br /> � o <br /> � � . <br /> 0 <br /> � <br /> dGite: OG-04-12 <br /> permit: <br /> revisior�s: <br /> 00-00-OU <br /> drewn by: 1�-t�iJ <br /> �he���d b�: <br /> �H��T <br /> � <br /> ���� �� ������..�� <br /> ��������� ��� ������ <br />