Laserfiche WebLink
_ _ _ _ _ <br /> __ ____ _ _ <br /> �� <br /> NYltten dtnerobro on thls d-orlrc��Fall have precedence over � . . <br /> ecabd dkronsbms. Gantactor ahall verlfy all dlmerrebre, <br /> corctltbre,etc,pertalnNg to the work befare proceedYg. <br /> The pvier mnt be notlfbd oF ay vcriatlaro fTan the � � . . <br /> tltnert9bro md/or ca'�ditbre sMrai ai theee d^ovKp. My <br /> wch vo^lallon ahall be reeolvedL�the Ownsr priar to <br /> proceedYrg wlth tFa r�or'k or fha Cantralor eFnll au.ept . <br /> WII reepanbllibj far the coet to roctffy eane. � � <br /> 103/4�� <br /> ROOFIN6 MATERIAL �r�`�'..,�"�'� ��1� r�J���i��1��5 <br /> OINI�%I6"OB5 SOLID GDX 240 PLYWOOD G�T�I�����L. I��O I��J: <br /> SHEftTHING;8d m 6"O.G.EDGE <br /> 8d e 12"O.G.FIELD <br /> . �7/I6°05B AGX PLYWD� EVES) i.All consEructicn p2r appllcaole codas Gf1C.�ordlnan�es. <br /> 24"GARDBOARD BAFFLE MIN.15�UNDERLAYMENT =�X 3�4�� �ooq IRG,IBG.1004 NlASFIIN6TOP1 STATc ENER6'f GODE <br /> ALLOW FOR I" AIR SPAGE NAIL b"EDGE,12"FIELD �Q <br /> MIN.EXTEND 12"ABOVE WITH 8d NAILS,U.N.O. HANDIZAIL 1—� 2.V2rIPy all dirn2nslons on�ob site.F:riny discrepancles <br /> INSULATION. GRIP IYa' -2" � to ine attentian oF Ortner ctnd/or Uesl�er. ,�_�,;,,�.:;�.t�,,�.;,;,,.„ <br /> PROJEGTION FROM � ; <br /> WALL NO LE55 NOSIN6 3.Oriner vtifl vaNfy wlndoN slzas nnd manuFacturzr(s)witn �,R <br /> �{qH�y�°. franar bePore �tart oF conetructlon. ,�- <br /> � r� J 3 <br /> Z 4.Or,e wlndow per be:Aroom snall rneei egress cade. �� <br /> 50LID SHEATHING � . � � 5.5kylight glazing per 200q IF3G. �q� � <br /> OR GDX PLYWD. ' <br /> WNERE EXPO�.�ED N I � � I 6. 7ru5s manuFacture�snall supply shap drar:tngs to Owner ', '�`"�����e`:'`�'_�•�.�'2 � <br /> v:.•'e::d•,f:L3t <br /> TO 1^�ATHER ( I � � i c,nd frame�r to revleN ond approve bafore fabrlcatlon. '� �;ri�i:;>F'Yli�?�:j-1{t'!'„'{j,J # <br /> � � <br /> OPEN RAIL: I � I i.Ovinar��III verify elec!rlcal and haat layouts wlth ,,.��z��""'"����"`"a� <br /> OPEN SPAGE BETiNEEN � � I � I ln�taller bafore Instullatlon. "==� <br /> TOP PL. PIGKETS SHALL BE � � I <br /> LE55 THAN 4"GLEAR � � � I 8.UnUer all parallal bearing.valls,use double)otsts or as <br /> IX FASGIA BD. � I � � I � � I noted on plc�n. Double�olsi(or extra T_ll)under all non- � <br /> y�/�Tq� - � I � � I ( / {IANGER bearing pqrallel viails. �_ <br /> GUTfER APPROVED TRUSSES BEARING c.0 � � � I y <br /> MANUFAGTURER'S r-�EAL. (() � � � ( / q. f�l pro duc ts to ba InS tu l leU per rnaruFac turer'� <br /> SEE ROOF FRAMIN6 PLAN _I i I I i �y / !nstallatlon gulda anc!approv�d reporte. <br /> FOR SPAUNG m I � � �/ Ail metal cornectlons to treated�vood shall ba a�a <br /> � <br /> � -✓ minlnwm;Eriple ztno ZMAX(6185 per ASTN(A653};Hot Dip ,.. <br /> INSLULATE PER WSEG �y� Gaivanze(f,STM fi 123 fcr connectvrs and ASTMI53 For �.) � <br /> 2X SIRD BLK'6.W/ � fcuEeners and anchors. � <br /> 2"SGREENED VENT 5/B'X 10"ANGHOR BOLT W/3"X3'X / / � � <br /> HOLES WITH I/4" �/4"PLATE WA5HER5 0 48'o.c.NO 0 Ali bathroom Pans,kitcheri hocd,c;nd clryar duci�shall ba � <br /> L I\ /I�I� ���� 2X4 STOP 3-2x12 exhausied throo h the attic to the roof or throu h tha � <br /> GORRPSION RESISTANT LE55 THAN 4Y�' � NO N10RE THAN 12" �/ y y <br /> METAL MESH GOYERING Y ��� PROM EA.END 51LL GORNER,JOINT, STRIN6ER5 Q Fioor sysEem to an outslde vinll. Aii wcill ducts shall � � <br /> END,OPENING ETG. l"MIN. � terminaie at Iga�t�6"irom a window openlny. r � <br /> FIRE BLOGK ALL VERTIGAL EMBEDMENT INTO GONG.EXGEPT e 2-2X HEADER '�✓ (� <br /> OPENIN65 IN WALLS AT �R WA�LS-5EE SHEAR WALL w (� B <br /> PLATES AND FLOORS NAILING SGHEDULE. � <br /> 2x P.T.51LL FLOOR J015T I (FIRESTOP) I� � « � <br /> � � c,LiM,�rlc� AN� G�o��r�Pr�l�., � i� <br /> � �� ° �4 REBAR o I6°O.G.HORIZONTAL FIREBLOGKS � ������`! GRI"1"Eh;l�: s� ��,/ � � <br /> ENGINEERED.1015T5,SIZE AND FIREBLOGK STAIRS� y'� fi-1 <br /> SPAGIN6 PER}'LAN OR 2X JOISTS ONGE IN TOF' d BOTTOM \ TERhII iE: SLIGHT TO MGDERATE �1 <br /> � OF RllN BETWEEN STRINGERS DEGAY: �LIGHT TG N10DERATE � "y � <br /> �Iu ��R #4 REBAR o 48"O.G.VERTIGAL � �-ONG RUN BETWEEN STUDS \ }^;IPticR Dc516h!TE��P: I�° � � <br /> USABLE SPAGE UNDER STAIRS IGESHIELP REG2UI2D: NO � <br /> a TO BE I NR FIRE CANSTRUGTION \ �LOOD i-IALfjRDS: 20U3 Iqu2 FIRM ^-' <br /> � ° 3"MIN. 5/8" TYPE 'X'G.W.B.(TWO LAYERS \ <br /> TOP PL. AT STAIR GEILING) AIR FREcLIh:G INDEX: 250 <br /> GLR.TYP. <br /> — — MEAN AflNUAL TEMP: 50 <br /> #4 REBAR <br /> W"�"BAR <br /> (2)2x TOP PLATE,LAP GORNERS, <br /> 0��5ET END JOINTS BY 48" ���I��d ����� <br /> ALL FOOTINGS TO BEAR ON STAIR NOT�S: q� <br /> BEARING SOIL TMQ RISER H�I6FIT — 7-3/4�� 1"TPcX. �OF LOP�DS: LL 25�/5F(SNO1^ll V' <br /> �"GYPSUM WALLSOARD,TYP. WALL 6REATER THAN 4'-0"PER PLAT! 3 ST�r I 1e �7�T�I L 1 i 1 I��� „ DL ISi/5F ,,,,,,g <br /> y(6'OSB.Oft PLYWD.SHEAT+tING. W/PVA YAPOR BARRIER� WALLS TR�P�D D�PTH = IO MIN. TOTaL 40�/5F <br /> NAIL 6"EDGE,12"�IELD WITH 8d AND GEILIN65 <br /> NAILS UNLE55 NOTED OTHERWISE GI SGALE� N.T.S. c, c_ <br /> FLJOR LOAD� LL 4U{�/�F' <br /> 2 ST17. �OUNi7�Tl0 i� T DL 10�/SF � <br /> TOT 1L 50:/5F � <br /> �7� SGALE: N.T.S. PER IRG R409.1.3 d R403.1.3.1 <br /> 2x 5TUD5 a I6°o.�.„-P. L I�I NG �RE� DEGK LOADS: UL�O�/5F <br /> TOTAL"!O�/�� „� <br /> FIRE BLOGK ALL VERTIGAL <br /> OPENINGS IN WALLS AT �AIL . I500 PSF MINIMUM <br /> PLATES AND FLOORS <br /> GOT:G�'ETE: 2:00 P51 AFTER 28 DAYS <br /> (5�/�SAGK MIiC) <br /> -3000 F51 FOR EXTcRiOR FOUNC�HTIOtd � <br /> t^I?�LLS,PORGNES,��F'S,APID OR <br /> �"X 10"ANGHO(Z BOLT YJ/9"X3"X�" G1fv\6E 5LF,85- AIP cNTfZ�IrU�IEN� <br /> SIDING,5EE PLAN FOR TYPE F'�TE YVA5�R5 e 48"o.c.NO LESS <br /> THAN 4�° d NO MORE THP�N 12" 15 Bci;^7EEN 5-�90(TABLE 402.2 IRG) � <br /> �ROM EA.END SILL GORNER,JOINT, <br /> PND,OPENING ETG. �"M�N. G�4R�G� <br /> ENBEDh1ENT INTO GONG.EXGEPT� M,��ONR'( : PER?OOu IBG <br /> SHEfkR WALLS-5EE SNEAR WALL STEEL : PER 20Ua IF3G(6RADE 40) <br /> NAILING SGHEDULE. <br /> WOOD : PER 20Uq IBG <br /> Pl�ILIh(G : P�R 200�1 IRG PlF,ILIh,G PEK TAE3L= <br /> R6023(I),P,802.10 <br /> 2x BOTTOM PLATE ;^71h1D: d5 h�IPFf <br /> 2x P.T.SILL R-10 INSULATION 4"GONG.SLAB ON SEISMIG "LONE- Di dqtp: O�/OI/10 <br /> AT PERIMETER �4"GRANULAR BED permit: <br /> V = sae desiyn calc��aticns('�;r,ll) <br /> �IN. FLR. rier;iHERIN6 PO�NTIftL= MOUER.ATE <br /> Z— - - 4"GONG.SLAB ON PR05T LIPlE: t2" revl5lons: <br /> 4'�D.S.TI6HTLINE,P051TIVE ° ° ° a a ° d ° ° a � a o a 4"6RftNULAR BED E.F.P.: 45 PSF <br /> DRAIN TO STORM 5Y5TEM � I�4 ° a ° ° � �� _ <br /> QI I �"F3EAN1: DGU6LA5 FIR+�2 <br /> AWAY�RO TBUILDONG i� \ \/\ � Q o. a o cJ b"BFAh1. �b- Io00,000 <br /> � �� �� ��� a. 4' F'05T: DGU6LA5 PIR�2 <br /> \ \� � 4 6" P05T: fb = 8"515 P51 <br /> a E = 1,300p0o <br /> � ���\� ° .;015T5 i RAFTERS HEM FIR��2 <br /> � � � ° 3 5TUD5: iv = "I� <br /> �/\��/\�� o Fb = 850 PSI drawn ey: RO <br /> // /� / a a E = i,�oo,000 checkad by: <br /> \����� R�AR PLAGEMENT GLU-LAM BEAM� <br /> \ SHEET <br /> SEF DETAIL�2 A80VE <br /> � \// � � fb - 1�400'psI(rEduced'ct� size <br /> \ a � � <br /> � \ d � o d E = I,800.000 pslKl) <br /> — \ � \ a o <br /> � <br /> a o a P10TE: <br /> � � m � ALL REINFORGEMENT VAiZ1A"ilOP15 FFLOM THE ABOVE <br /> 4"� PEiZF.FOOTING DRAIN TILE v �T BE TIED IN PLAGE NOTED Ohl�;E PLA�15.�E <br /> W/GLOTH GOVER d 6RANULAR FOR FOUNDATION INSPEUTON "�(�I G�L W�LL 5EGT1 ONS <br /> GOVEFt A5 REC�'D.BY 501L � <br /> GONDITIONS SEE FOUNDftTION PLAN I. SUBFLOOR: <br /> FOR PTG./FDN.51ZE C7I SGALE� N.TS. T3G PLYt^{OOD OR CiSB APA RATED <br /> STURD-I-FL002 I6"D.G.,3/4" <br /> ALL FOOTIN65 TO BEAR ON Wt�LL 3 ROGF SH=A"ii�ilM6: <br /> BEARING SOIL f,PA RATED SHEATING 34/Ih ")/lo" <br /> POOTIPIG FOR : <br /> 8"WALL - I�"x i2" FOOTIHG <br /> IS"SELOYV GRADE <br /> �i4�TUB STEEL -�+�' �.�.VER"1'. <br /> UNLE55 PlOTED O7HEFdl^I�SE ' <br /> ����� ��' ��/����� <br /> ���f������ ��� ������ <br />