3 <br />0 <br />i <br />1 <br />2 <br />GENERAL PROJECT NOTES: <br />1. <br />ALL WORK SHALL CONFORM TO THE 2018 EDITION OF CITY OF EVERETT DESIGN AND CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS. THESE STANDARD PLANS ARE REFERENCED TO IN THESE DESIGN <br />DRAWINGS. A COPY OF THESE DOCUMENTS SHALL BE ON SITE DURING CONSTRUCTION. <br />2. <br />A COPY OF THE APPROVED PLAN MUST BE ON SITE WHENEVER CONSTRUCTION IS IN PROGRESS. <br />3. <br />LOCAL AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES. <br />4. <br />ALL PERMITS REQUIRED FOR WORK WITHIN THE PUBLIC RIGHT OF WAY MUST BE OBTAINED PRIOR TO <br />THE START OF CONSTRUCTION. <br />E 5. <br />PRIOR TO THE START OF CONSTRUCTION WITHIN THE RIGHT OF WAY, THE CONTRACTOR SHALL <br />SCHEDULE AND ATTEND A PRECONSTRUCTION MEETING WITH THE CITY OF EVERETT PUBLIC WORKS <br />DEPARTMENT. <br />6. <br />THE CONTRACTOR SHALL PROTECT ALL AREAS OUTSIDE THE WORK ZONE AND OUTSIDE THE <br />RIGHT-OF-WAY FROM DISTURBANCE. ALL DISTURBED AREAS SHALL BE FULLY RESTORED TO PROPOSED <br />OR PRE-EXISTING CONDITIONS. <br />7. <br />ALL DAMAGE TO INFRASTRUCTURE CAUSED BY THE CONSTRUCTION SHALL BE REPAIRED IN KIND OR AS <br />REQUIRED BY THE CITY OF EVERETT INSPECTOR. <br />8. <br />THE APPROVED PLANS SHOW THE APPROXIMATE AREA OF PAVEMENT RESTORATION BASED ON THE <br />DEPTH OF U1ILITY CUTS AND/OR THE AREA OF CURB AND/OR PAVEMENT TO BE REMOVED AND <br />REPLACED. THE ACTUAL LIMITS OF THE PAVEMENT RESTORATION SHALL BE DETERMINED IN THE FIELD <br />WITH THE CITY OF EVERETT INSPECTOR PRIOR TO THE PAVEMENT RESTORATION. <br />9. <br />HORIZONTAL DATUM: NAD 83/91. VERTICAL DATUM: NAVD 88. <br />10. <br />SURVEYING AND STAKING OF ALL IMPROVEMENTS IN THE PUBLIC RIGHT OF WAY SHALL BE COMPLETED <br />PRIOR TO CONSTRUCTION AND COORDINATED WITH CITY INSPECTOR TO VERIFY POSITIVE DRAINAGE IS <br />OBTAINED. <br />11. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR REFERENCING AND REPLACING ALL MONUMENTS THAT <br />MAY BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND SHALL FILE AN APPLICATION FOR <br />PERMIT TO REMOVE OR DESTROY A SURVEY MONUMENT WITH THE WASHINGTON STATE DEPARTMENT OF <br />NATURAL RESOURCES, PURSUANT TO RCW 58.24.040(8). <br />D 12. <br />THE CONTRACTOR SHALL COORDINATE WITH THE CITY FOR ANY SUBMITTAL OF DOCUMENTS IN <br />CONFORMANCE WITH THE STANDARD SPECIFICATIONS PRIOR TO CONSTRUCTION. A MATERIAL SOURCE <br />FORM FOR ALL MATERIALS TO BE PLACED IN THE RIGHT OF WAY AND MIX DESIGNS FOR ALL ASPHALT, <br />CONCRETE AND AGGREGATES TO BE PLACED IN THE RIGHT OF WAY MAY REQUIRE SUBMITTAL FOR <br />REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION. <br />13. <br />THE CONTRACTOR SHALL NOTIFY THE EVERETT FIRE DEPARTMENT DISPATCHER AT LEAST TWENTY-FOUR <br />(24) HOURS IN ADVANCE OF ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, AND STREET <br />CLOSURES OR OTHER ACCESS BLOCKAGE. <br />14. <br />THE CONTRACTOR SHALL LOCATE AND PROTECT ALL CASTINGS AND UTILITIES DURING CONSTRUCTION. <br />15. <br />THE CONTRACTOR SHALL CONTACT THE UNDERGROUND UTILITIES LOCATOR SERVICE (1-800-424-5555) <br />AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. <br />16. <br />IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE ACCURACY OF ALL UTILITY <br />LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN WHICH <br />MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE IMPROVEMENTS. <br />17. <br />THE CONTRACTOR SHALL ADJUST ALL EXISTING MANHOLE RIMS, DRAINAGE STRUCTURE LIDS, VALVE <br />BOXES, AND UTILITY ACCESS STRUCTURES TO FINISH GRADE WITHIN AREAS AFFECTED BY THE <br />PROPOSED IMPROVEMENTS. <br />18. <br />THE CONTRACTOR SHALL PROVIDE FOR ALL TESTING AS REQUIRED BY THE STREET INSPECTOR. <br />19. <br />BACKFILL MATERIAL USED IN PUBLIC RIGHT-OF-WAY SHALL MEET CITY OF EVERETT DESIGN AND <br />CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE STANDARDS SET FORTH IN THE PROJECT <br />C <br />MANUAL. <br />20. <br />INSPECTION AND ACCEPTANCE OF ALL WORK IN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE BY <br />REPRESENTATIVES OF THE CITY OF EVERETT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO <br />COORDINATE AND SCHEDULE APPROPRIATE INSPECTIONS ALLOWING FOR PROPER ADVANCE NOTICE. THE <br />STREET INSPECTOR MAY REQUIRE REMOVAL AND RECONSTRUCTION OF ANY ITEMS PLACED IN THE RIGHT <br />OF WAY THAT DO NOT MEET CITY STANDARDS OR THAT WERE CONSTRUCTED WITHOUT APPROPRIATE <br />INSPECTIONS. <br />21. <br />THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY EROSION CONTROL AND SEDIMENTATION <br />COLLEC11ON FACILITIES TO ENSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE STORM DRAIN <br />SYSTEM. AS CONSTRUCTION PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, <br />ADDITIONAL CONTROL FACILITIES MAY BE REQUIRED. DURING THE COURSE OF CONSTRUCTION IT SHALL <br />BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS <br />THAT MAY BE CREATED BY THE CONTRACTOR'S ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES <br />THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES. <br />22. <br />THE CONTRACTOR SHALL KEEP ALL PAVED SURFACES IN THE RIGHT OF WAY CLEAN BY SWEEPING. <br />23. <br />CONTRACTOR'S TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE CITY OF EVERETT TRAFFIC <br />CONTROL MANUAL FOR IN -STREET WORK. AN APPROVED TRAFFIC CONTROL PLAN WILL BE REQUIRED <br />FOR ALL ARTERIAL STREETS PRIOR TO BEGINNING CONSTRUCTION. <br />24. <br />ALL WORK PERFORMED BY ANY CITY OF EVERETT DEPARTMENTS AND OTHER UTILITY PURVEYORS TO <br />3 <br />REMOVE OR RELOCATE EXISTING UTILITIES SHALL BE DONE AT THE CONTRACTOR'S EXPENSE. <br />25. <br />CARE SHALL BE EXERCISED WHEN EXCAVATING NEAR EXISTING CHARGED WATER MAINS. <br />B W <br />0 <br />0 <br />GENERAL <br />CONSTRUCTION NOTES: <br />o <br />1. <br />APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND <br />ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF <br />y <br />LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL U1ILITIES NOT SHOWN. IF CONFLICTS WITH <br />- <br />EXISTING U1ILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. ANY <br />r <br />CHANGES REQUIRED SHALL BE APPROVED BY THE CITY PRIOR TO COMMENCEMENT OF RELATED <br />CONSTRUCTION ON THE PROJECT. <br />z <br />2. <br />CONTRACTOR SHALL NOTE INVERT ELEVATIONS ON EXISTING AND PROPOSED MANHOLES. NOTIFY <br />ENGINEER IF ELEVATIONS DIFFER FROM PLANS PRIOR TO ORDERING MANHOLES. <br />Ii <br />3. <br />ALL SAWCUT PAVEMENT TO BE RESTORED AT THE LIMITS INDICATED ON THE DRAWINGS. <br />LE <br />0 4. <br />INSTALLATION OF RELOCATED SIGN POSTS SHALL BE PER CITY OF EVERETT STANDARD DETAILS NO. 715 <br />g <br />AND NO. 716. <br />0 5. <br />CONTRACTOR SHALL FIELD VERIFY EXISTING PIPE MATERIAL AND OUTER DIAMETER WHERE CONNECTING <br />TO EXISTING PIPE PRIOR TO ORDERING COUPLINGS. <br />0 <br />s TESC NOTES <br />1. <br />SURVEY SHOWN ON DESIGN DRAWINGS HAS BEEN SCREENED FOR CLARITY. REFER TO SURVEY SHEETS <br />FOR EXISTING CONDITIONS. <br />A 2. <br />CONTRACTOR SHALL PROVIDE CONSTRUCTION FENCING AS REQUIRED FOR SAFETY. CONSTRUCTION FENCE <br />r <br />SHOWN REPRESENTS A CONCEPT NOT INCLUSIVE OF ALL WORK. CONTRACTOR SHALL MODIFY FENCE <br />" <br />CONFIGURATION TO ACCOMMODATE THE CURRENT STAGE OF CONSTRUCTION AND PEDESTRIAN TRAFFIC <br />E <br />FLOW. SEE DEMOLITION SERIES FOR ASSOCIATED DEMOLITION ACTIVITY. <br />a <br />v <br />3. <br />CONTRACTOR SHALL OBTAIN TRENCH DEWATERING DISCHARGE AUTHORIZATION TO THE SANITARY SEWER <br />FROM THE CITY OF EVERETT INDUSTRIAL PRETREATMENT DIVISION. <br />N <br />N 4. <br />CONTRACTOR SHALL KEEP STREET FREE OF SEDIMENT. IF SEDIMENT IS TRACKED ONTO STREET, STREET <br />SWEEPING SHALL BE IMPLEMENTED IMMEDIATELY TO CORRECT. <br />0 <br />5. TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE IN PLACE AND OPERATING <br />PRIOR TO DEMOLITION AND CONSTRUCTION ACTIVITIES. ADDITIONAL EROSION CONTROL MEASURES MAY <br />BE REQUIRED DEPENDING ON SITE AND WEATHER CONDITIONS. <br />6. ALL EXISTING AND PROPOSED CATCH BASINS DOWNSTREAM OF DISTURBED AREAS SHALL BE PROTECTED <br />DURING CONSTRUCTION PER STANDARD PLAN NO. 212. <br />7. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE ANY SEDIMENT TRACKED OFF <br />THE SITE. <br />8. THE CONTRACTOR SHALL PERFORM ROUTINE INSPECTION AND MAINTENANCE OF ALL INSTALLED EROSION <br />AND SEDIMENT CONTROL BMP'S, ESPECIALLY AFTER STORMS. <br />9. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENTS FROM ENTERING WATER WAYS IF THE <br />PROPOSED BMP'S FAIL. <br />10. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE <br />THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 <br />THROUGH SEPTEMBER 30. <br />GENERAL STORM DRAIN NOTES: <br />1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT (CITY) STANDARDS AND <br />WSDOT/APWA STANDARD SPECIFICATIONS. <br />2. ALL REQUESTS FOR INSPECTIONS AND FOR WITNESSING TESTS SHALL BE SCHEDULED WITH THE <br />ENGINEER 72 HOURS IN ADVANCE. FAILURE TO GIVE ADEQUATE ADVANCE N0110E MAY RESULT IN <br />DELAYS TO THE CONTRACTOR FOR REQUIRED INSPECTIONS. <br />3. SAWCUT OR TRENCH WHEEL CUT PAVEMENT PRIOR TO DIGGING. <br />4. ALL MANHOLES OVER 3 FEET IN HEIGHT SHALL BE PROVIDED WITH A LADDER OR STEPS PER CITY OF <br />EVERETT STANDARD PLAN NO. 608. <br />5. SUBMIT SHOP DRAWINGS FOR ALL NEW MANHOLES TO THE ENGINEER FOR APPROVAL. NO MANHOLE <br />SHALL BE MANUFACTURED PRIOR TO APPROVAL OF SHOP DRAWINGS. <br />6. ALL PIPES SHALL BE CLEARLY MARKED WITH TYPE, CLASS AND THICKNESS, AS APPLICABLE. LETTERING <br />SHALL BE LEGIBLE AND PERMANENT UNDER NORMAL CONDITIONS OF HANDLING AND STORAGE. <br />7. AFTER BACKFILL ALL STORM DRAIN CONNECTIONS SHALL BE TESTED IN ACCORDANCE WITH WSDOT <br />STANDARD SPECIFICATIONS 7-17.3(2)F. STORM DRAIN CONNECTIONS THAT ARE RECONSTRUCTED OR <br />REPAIRED TO A LENGTH OF 10 FEET OR MORE SHALL BE TESTED FOR WATERTIGHTNESS <br />SIMULTANEOUSLY WITH THE MAIN LINE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATIONS <br />7-17.3(2)F. TESTING SHALL BE PERFORMED IN THE PRESENCE OF THE CITY INSPECTOR. <br />8. TEMPORARY BYPASS PLANS FOR ALL STORM DRAIN SYSTEM SHALL BE SUBMITTED TO THE CITY FOR <br />APPROVAL. <br />9. TEMPORARY BYPASS SHALL BE INSTALLED AND FULLY OPERATIONAL PRIOR TO REMOVAL OF ANY <br />MANHOLES. <br />10. STRUCTURAL FILL OR CSBC OR GB WILL BE REQUIRED FOR BACKFILL AROUND ALL NEW MANHOLES. <br />11. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS ON EXISTING AND PROPOSED MANHOLES. NOTIFY THE <br />ENGINEER IF ELEVATIONS DIFFER PRIOR TO ORDERING MANHOLES AND PRIOR TO BEGINNING ANY PIPE <br />INSTALLATION. <br />12. PROTECT ALL INSTALLED PIPES AND STRUCTURES WITH BACKFILL, STEEL PLATES OR OTHER ADEQUATE <br />PROTECTION FROM CONSTRUCTION AND TRAFFIC LOADS PRIOR TO FINAL GRADING AND PAVING. <br />13. PROTECT ALL EXISTING U11LIlIES TO REMAIN. <br />14. DO NOT ALLOW FLOW OF STORMWATER OR RAW SEWAGE TO ENTER THE TRENCH OR EXCAVATION PIT. <br />15, AT THE END OF EACH WORKDAY AND IN WORK LOCATIONS WHERE THE CONTRACTOR IS NOT PRESENT, <br />ALL OPEN EXCAVATIONS, TRENCHES OR MANHOLE STRUCTURES SHALL BE COVERED WITH STEEL PLATES <br />OR PORTABLE FENCE PANELS. IN ADDITION, CONSTRUCTION SAFETY FENCE (CHAIN LINK) SHALL BE <br />ERECTED TO SURROUND THE WORK AREA. <br />16. SEWER SHALL MAINTAIN A MINIMUM LATERAL CLEARANCE AS FOLLOWS: 10 FEET FROM POTABLE WATER <br />MAIN, 3 FEET FROM ALL CONDUITS, AND 4 FEET FROM ALL NATURAL GAS LINES. <br />GENERAL WATER NOTES: <br />1. POTHOLE ALL EXISTING UTILITIES TO VERIFY SIZE, ELEVATION, AND LOCATION. POTHOLING SHALL BE AT <br />A MINIMUM 100 FEET AHEAD OF PIPE INSTALLATION. IF A CONFLICT IS ENCOUNTERED, DEFLECT PIPE TO <br />PROVIDE CLEARANCE BETWEEN NEW AND EXISTING UTILITIES AS APPROVED BY THE ENGINEER. <br />2. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED <br />BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND <br />RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS. <br />3. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS DEPARTMENT <br />AT THE DEVELOPER'S EXPENSE. THE PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 <br />BUSINESS DAYS N0110E FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL THEREAFTER <br />DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. <br />4. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. <br />5. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF <br />CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS CONSTRUCTION DIVISION MUST BE NOTIFIED AT <br />LEAST 24 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />6. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE PUBLIC WORKS <br />DEPARTMENT OF A PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON <br />A 24 HOUR BASIS. <br />7. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCH VERTICAL SEPARATION BETWEEN POTABLE <br />AND NON -POTABLE CONVEYANCE SYSTEMS. <br />8. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. <br />ALL VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />9. CONTRACTOR TO PROVIDE ALL NECESSARY PAVEMENT REMOVAL, EXCAVATION, SHORING, DEWATERING, <br />PIPE & FITTINGS, PIPE ALIGNMENT AND PIPE SUPPORT REQUIRED FOR PIPE HOOK-UP TO THE EXISTING <br />WATER MAIN. VERIFY EACH CONNECTION BY POTHOLE AND FIELD VERIFY THAT ALL CONNECTIONS ARE <br />CORRECT. ALL CORRECT FITTINGS AND CONNECTIONS MUST BE ON SITE AND VERIFIED PRIOR TO <br />SCHEDULING CITY CREWS. CONNECTIONS TO BE MADE PER SECTION 7-09 OF THE SPECIAL PROVISIONS <br />AND STANDARD SPECIFICATIONS. <br />10. ABANDON EXISTING WATER MAINS IN PLACE, EXCEPT WHERE EXISTING MAINS CONFLICT WITH NEW WORK. <br />ABANDONMENT OF WATER MAINS SHALL BE PER COE SPECIFICATIONS. <br />11. NOTIFY FIRE DEPARTMENT 48 HOURS IN ADVANCE OF TAKING OUT OF SERVICE ANY FIRE HYDRANT, <br />SPRINKLER SUPPLY, OR OTHER FIRE PROTECTION WATER EQUIPMENT. <br />12. ALL VALVES BOXES AND EXTENSIONS SHALL BE ADJUSTED TO FINISH GRADE JUST PRIOR TO FINAL <br />PAVING, SEE COE STANDARD DRAWING 504. <br />13. FOR DRAWING CLARITY SOME CONCRETE THRUST BLOCKING MAY NOT BE SHOWN. THRUST BLOCKS OR <br />JOINT RESTRAIN SHALL BE REQUIRED WHERE JOINTS ARE NOT RESTRAINED BY FUSING OR FLANGES. <br />ALL JOINTS FOR FIRE HYDRANTS ASSEMBLES (INCLUDING TEE) SHALL BE RESTRAINED. <br />14. FLUSHING AND DISINFEC1ON OF WATER MAINS SHALL BE IN ACCORDANCE WITH SPECIAL PROVISIONS <br />7-09.3(24). <br />15. ALL WORK ON WATER SERVICES AND METERS SHALL BE DONE IN ACCORDANCE WITH SECTION 7-15 OF <br />THE SPECIAL PROVISIONS AND THE CITY OF EVERETT STANDARD DRAWINGS. <br />16. INSTALL NEW WATER MAINS SO THAT 3 FEET MINIMUM OF FINAL COVER IS PROVIDED, EXCEPT IN THOSE <br />LOCATIONS WHERE EXISTING UTILITIES TO REMAIN ARE ENCOUNTERED, WHERE NEW MAIN CONFLICTS WITH <br />SANITARY AND STORM PIPING, OR AT NEW TELEPHONE SYSTEM STRUCTURES. MAKE GRADE <br />ADJUSTMENTS AS REQUIRED TO AVOID CONFLICTS WITH OTHER U1ILITIES AS APPROVED BY THE <br />ENGINEER. <br />17. SAFETY SYSTEMS FOR TRENCHES AND ALL OTHER EXCAVATIONS SHALL CONFORM TO LAWS AND <br />REGULATIONS PER WA. STATE RCW, WAC AND OSHA. <br />18. WATER SERVICE TO ALL LOTS SHALL BE MAINTAINED THROUGHOUT THE PROJECT AT ALL TIMES. <br />STORM DRAINAGE NOTES (COE): <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS <br />BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, <br />AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND <br />ARE SHOWN FROM CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF <br />LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING <br />UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL N011FY THE PUBLIC WORKS INSPECTOR <br />AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT <br />OF RELATED CONSTRUCTION ON THE PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY <br />SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, <br />LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT <br />VED <br />"SERVICES <br />DATE <br />EROSION <br />PUBLIC WORKS <br />DRAINAGE <br />©EPARnIENT <br />WATER <br />A PUBLIC WORKS PERMIT IS <br />PRIOR TO STARTING <br />SEWER <br />ANY CONSTRUCTION ON THIS <br />ANY <br />PROJECT. APPROVAL FOR THIS <br />PROJECT IS CONDITIONAL PER <br />TRAFFI <br />CURRENT CITY STANDARDS AND <br />EXPIRES UNLESS <br />P:RMIT FOR CONSTRUCTION HAS <br />CIV E GINEER <br />BEEN ISSUED. <br />E <br />CONSULTANT: <br />16015th Avenue, Suite 1600 <br />Seattle, WA 98101 <br />206.622.5822 <br />www.kpff.com <br />REGISTRATION STAMP: <br />PROJECT IDENTIFICATION: D <br />Evergreen Branch <br />Library <br />Expansion <br />FOR <br />City of Everett <br />AT <br />9512 Evergreen Way <br />Everett WA 98204 <br />PR 1 <br />12/14/2018 <br />This drawing is: <br />1. Copyright 2017 Dykeman, Inc. C <br />2. The Architect's Instrument of Professional Service. <br />3. For use on this project only. Obtain Architect's <br />written permission for any other use or reproduction. <br />PROJECT NUMBER: <br />1700170 <br />REVISIONS: <br />MARK DATE DESCRIPTION <br />08-07-17 DD COST EST. <br />08-17-17 DD SUBMITTAL <br />08-14-18 PERMIT SUBMITTAL <br />09-10-18 BID SET <br />I <br />B <br />PROJECT TEAM: <br />PRINCIPAL IN CHARGE: <br />I MAV <br />PROJECT MANAGER: <br />I AGC <br />PROJECT ENGINEER: <br />I CB <br />DRAWN BY: <br />I TAD <br />KEYPLAN: <br />DRAWING TITLE: <br />A <br />NOTES <br />FD)C"L� <br />I DRAWING NUMBERS " '-1 <br />Permit Services <br />con <br />1 <br />2 1 3 <br />4 <br />61 <br />6 <br />