My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9512 EVERGREEN WAY 2022-08-29
>
Address Records
>
EVERGREEN WAY
>
9512
>
9512 EVERGREEN WAY 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:14:41 AM
Creation date
8/6/2020 1:12:41 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9512
Permit
PW1712-019
Notes
BRANCH EXPANSION - EVERGREEN BRANCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IUBLICOVORKS PERMIT_Date Applied:- 12/8/2017 <br />City. of Everett Permit Services - Public Works Permit #: PW1712-019 <br />3200 Cedar Street, 2"d Floor Associated Bldg Permit #: <br />Everett, WA 98201 Planning Reference #: <br />(425) 257-8810 Public Works Fee: $8324.21 <br />[� 7 JAN 7019 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />EVERETT CITY OF <br />DYKEMAN <br />- 3002 WETMORE-AVE = <br />1716 W MARINE VIEW DR <br />EVERETT, WA, 98201 <br />EVERETT, WA, 98201 <br />PHONE: <br />PHONE: 4256092327 <br />TAX PARCEL ID Mm00480200300100 <br />SITE ADDRESS: 9512 EVERGREEN WAY <br />DESCRIPTION: EVERETT LIBRARY - EVERGREEN BRANCH <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in'accordance with the permit and current City of Everett `Design and Construction Standards <br />and Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works <br />Department dated 01/11/2019. Approved plans must remain on job -site at all times. <br />_Inspections_are required for allstages of construction. Visit the City_'s On_lne_Permitting Portal at pw.everettwa.gov_ <br />-_formally-request-all required -inspections, -Flyers are provided at permit -issuance with instructions on how-to request -an - <br />inspection online. - - <br />6. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. <br />This work to be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the <br />Water Department. Work shall be scheduled 3-4 weeks in advance. <br />7. As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Inspector per City <br />Design and Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br />8. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contact the <br />Planning Department at 425-257-8731 to schedule the inspection. <br />9. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection lineto <br />request a Final for this permit when all items have been completed. <br />Public Works Permit Fee Breakdown: <br />;y <br />Paving (41,000 SF)...................................$205.00 <br />Erosion Control.........................................$200.00 JAN 1 7 2019 <br />Grade/Fill/Excavate-(400 CY).........:........$110.00 <br />PW Plan Review........ .... - ....$2603.07 - CITY OF EVERETT <br />PW Site Inspection... .... ....$5206. I4 _,;-.- Permit S:eryices ., . <br />- - City of EverettOlfidal Use Only - - - . -- -- ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation and <br />maintenance of the improvement or other right-of-way use here to applied <br />A rove for Construction tAblic W rks) ate for and further agrees to remove same upon notice from the City and to <br />public prope damaged thereby. <br />i t`7 i <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETEION. THIS PERMIT MAYBE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT. OVER 90-DAY DURATION.____ <br />
The URL can be used to link to this page
Your browser does not support the video tag.