Laserfiche WebLink
PRIMATE WORK <br />Item <br />Unit <br />Quantity fUn:i:t:P:rice <br />Amount - <br />Storm Sewers <br />4 - 6 Inch Pipe <br />L.F. <br />20.00 <br />5,760.00 <br />8 Inch Pipe <br />L.F. <br />; ,i <br />25.00 <br />11,775.00 <br />12 Inch Pipe <br />L.F. <br />35.00 <br />5,985.00 <br />Yard Basin <br />Ea. <br />` <br />200.00 <br />1,600.00 <br />Standard Catch Basin <br />Ea. <br />700.00 <br />5,600.00 <br />Extra Depth Excavation, <br />Over 12' dee <br />Ft./L.F. <br />5.00 <br />48 Inch MH/CB Type II <br />Ea. <br />1 <br />1,800.00 <br />1,800.00 <br />54 Inch MH/CB Type II <br />Ea. <br />2,700.00 <br />Extra Depth MH/CB, <br />48 inch per ft. over 12 <br />Ft. <br />110.00 <br />Extra Depth MH/CB, <br />54 inch per ft. over 12 <br />Ft. <br />140.00 <br />Restrictor/Pollution Control, <br />12 Inch Large) <br />Ea. <br />1 <br />1,000.00 <br />1,000.00 <br />Storm Water-11auii= Pipe <br />Ea. <br />1 <br />15,000 <br />15,600.00 <br />SD Pump Station <br />Ea, <br />1 <br />80,000 <br />80,000.00 <br />other 72" SDMH <br />; < <br />2 <br />5,000 <br />10,000.00 <br />Storm Sewers Total: $ 139,120.00 <br />COST EST FEE CALC - 2018 <br />