Laserfiche WebLink
Cllenl: gtyol F.varell <br />KPFF l; Evergreen LIOrary <br />S KPFFp: 1700770 <br />By. Ce <br />Oalc: 1f3113010 ttev 0%.09.101ar VF: <br />Fntdneees Estimate of Probable Cost -Evergreen Library <br />EsllmalM'i. Cnmpfele. 1007: <br />1TE61 <br />ITEM <br />OTY <br />UNIT <br />UNIT PRICE <br />COST <br />•/. <br />NO. <br />I <br />MOBILIZATION <br />I <br />LS <br />8%1 <br />56377 <br />8.0% <br />2 <br />BUILDING DEMO <br />I <br />ALL <br />$?O.OWODI <br />520 <br />25% <br />3 <br />SAW CUTTING EXSTING PAVEMENT <br />_ <br />1231 <br />_ <br />-650 <br />58.002 <br />101 <br />4 <br />CONCRETE SIDEWALK REI.IOVAL AND DISPOSAL <br />47B <br />_LF_ _ <br />BY <br />$17. <br />561 <br />10% <br />5 <br />REMOVING ASPHALT PAVEI.fENT <br />153/ <br />BY <br />$16. <br />$24.344 <br />31% <br />6 <br />CURB REMOVALANO DISPOSAL <br />524 <br />LF <br />Sli.00 <br />SS.764 <br />0.7% <br />7 <br />CUT AND CAP EXISTING GFWE R S E RVICE <br />1 <br />EA <br />5500. <br />SSW <br />0.1% <br />_ <br />S <br />REMOVE AND RF.PI ACE. EXISTING COLII,IVAULT <br />1 <br />EA <br />56,00D00 <br />___ <br />S6.000 <br />087. <br />9 <br />REMOVE AND RE.PI ACE. EXISTING CONIM CONDUITS <br />216 <br />LF <br />$5000 <br />310.800 <br />LAY. <br />IO <br />CLEATING. GRUBAIMSTRIPYINO <br />063 <br />-_(150 - <br />Aun <br />51700D00 <br />SIO.781 <br />1.4% <br />II <br />EARTHWORK GITAI51410 _- <br />CY <br />SIGDO <br />SIGH <br />1.4'A <br />12 <br />EARTHWORK MIGHT <br />&M <br />CY <br />$3000 <br />321.11(X1 <br />3.1% <br />13 <br />CONSTRUCTION PROTECTION FENCE <br />936 <br />LF <br />$2 Co. <br />VAN <br />02% <br />14 <br />REMOVE CATCH BASIN <br />21 <br />FA <br />5770 <br />51510 <br />02% <br />32 <br />4' CRUSHED SURrACING BASE COURSE <br />478 <br />TON <br />$40. <br />S19,120 <br />24% <br />33 <br />3' LIMA <br />397 <br />TON <br />130 <br />551,610 <br />6 S% <br />_ 34 <br />35 <br />CEMENT CONCRETE SIDEWALK <br />CEMENT CONC. CURB R1U.IP <br />184 <br />BY <br />519,M7 <br />24% <br />12 <br />SY <br />_$10_6. <br />$770.CC <br />_ <br />_ $3.24C <br />04% <br />36 <br />EXTRUDED CONC CURB <br />917 <br />IF, <br />5130O <br />511021 <br />1.5% <br />37 <br />VERTICAL CURB <br />213 <br />LF <br />S4a <br />S0.790 <br />SM.994 <br />f 7% <br />14% <br />38 <br />GRIND PAVEMENT <br />1we <br />SY <br />$14. <br />39 <br />I.IWASPWILT OVERLAY <br />164 <br />TON <br />S130. <br />$31,3a <br />21% <br />40 <br />STRIPING <br />1451 <br />LF <br />SS <br />37.25 <br />09% <br />41 <br />WHEEL STOP <br />5] <br />EA <br />3]YI 00 <br />513,11 <br />16% <br />EROSION CONTROLAND PLANTING <br />TO <br />EA <br />S9000 <br />$900 <br />0.1% <br />043421NLETPROTF.CTION <br />SILTFENCF. <br />223 <br />LF <br />5G.00 <br />S1338 <br />02'4 <br />ELECTRICAL <br />/4 <br />2 E,SCIIEDULE40- COMMUNICATIONIII8ER OPTIC <br />330DO <br />516.80C <br />2A% <br />452'ELECiRICAL <br />CONDUIT <br />796 <br />9r <br />$8.75 <br />16.667 <br />0.6% <br />46 <br />PARKING LOT LIGHT RELOCATION (BY ELECTRICAI <br />Ea <br />50 <br />00% <br />Oeslpn Carifryensy= S% n379,689 <br />Total Estimated Conslrucllon Cost = 3537,041 <br />ITEM Value Engineering ITEMS OTY UNIT UNITPRICE COST <br />NO. <br />1 <br />BUILDING DEMO <br />ALL <br />I20.U3)00 <br />9 <br />REMOVE AND REPLACE EXISTING COMM CONDUITS <br />LF <br />1 $50 <br />11 <br />FAIL RK GRACING <br />EARTHWORK EXPORT <br />CY <br />$16. <br />_ <br />12 <br />CYCY <br />$3000 <br />18 <br />AREA DRAIN <br />EA <br />51.000. <br />2 k; , <br />22 <br />— <br />PVC STORM SEWER PIPE 61N, DLV.I <br />LF <br />S45 <br />55 <;,II <br />27 <br />_-- <br />PERF PIPE4 IN. DIMA <br />LF <br />$34, <br />f1703 <br />32 <br />4' CRUSHED SURFACING BASE COURSE <br />TON <br />34u.� <br />52.630 <br />33 <br />3' HMA, <br />TON <br />513000 <br />tS7.2E01 <br />Total Estimated Value Engineering = (34,100) <br />„Im Sz 115,883) <br />Grand Total with VE Items = S80T.479 <br />Assumptions <br />(1) Cost In current Yoar doll rs. <br />(2j Cost does not incloda Sales Tax on Construction. <br />(3) Cost does not include Right -of -Way, Acquisilion. <br />(4) Cost does not include any mitigation for --land, stream, or buffer Impacts. <br />(5j Cost does not Include ailotnnces for enountering any hazardous materials of associated disposal costs. <br />(5) Cosl does not include a'l—Inces for relocation of Banchiso utilities. <br />Iei VE-1 Enauv 111. <br />