Laserfiche WebLink
5. Permanent Stormwater Control Plan <br />Table 5-1: Development Area Summary <br />Surface . Area (AC) <br />- <br />New or Replaced Hard Surface 0.561 <br />New Pollution Generating Impervious Surface 0.255 <br />Table 5-2: Flow Control Model Predeveloped Summary <br />Table 5-3: Flow Control Model Developed Summary <br />Table 5-4: Full Site Existing vs. Developed Flow Summary <br />FLOW CONTROL <br />As previously discussed, the project is required to meet the standard flow control requirement. This <br />requirement states, "Stormwater discharges shall match developed discharge durations to pre -developed <br />durations for the range of pre -developed discharge rates from 50% of the 2-year peak flow up to the full 50- <br />KPFF Consulting Engineers <br />6 <br />