Laserfiche WebLink
1 1 2 1 3 1 4 1 5 1 6 <br /> TO INVERTER <br /> CONTROL SYSTEM INTENT <br /> CONTROL SYSTEM INTENT.THE INTENT IS TO USE THE VRF MANUFACTURER'S PROPRIETARY SYSTEM TO <br /> PROVIDE PROGRAMMING CONTROL ALL OF THE VRF COMPONENTS. THE DISTECH SYSTEM SHALL BE USED TO MONITOR THE SPLIT D� <br /> POR GUI AND GRAPHICS SYSTEM UNITS AND CONTROL ERV-4 AND THE ELECTRIC DUCT HEATERS.THE SPLIT SYSTEMS SHALL BE <br /> CONTROLLED BY 7-DAY PROGRAMMABLE THERMOSTATS.THE VRF SYSTEM SHALL COMMUNICATE WITH <br /> THE DISTECK CONTROLLER VIA A GATEWAY OR BAC NET CARD.THE DISTECH SYSTEM SHALL BE PROVIDED - - i- 4' 111'-'1i. HINEMONDINI <br /> AN IP ADDRESS AND CONNECT TO THE INTERNET. ARGHITEC-TURE 0 DESIGN <br /> www.dy eman.net 716 West Marine View Drive <br /> AHU425.259. 161 (T) ._ <br /> Floor/EveretWA 98201 <br /> VRF TO VRF <br /> E DISTECH BUILDING PROPRIEYARY all" CU E <br /> CONTROLLER CONTROLLER <br /> DDC CONTROL INPUT/OUTPUT POINT SUMMARY [CONSULTANT: <br /> INPUTS OUTPUTS SYSTEM FEATURES <br /> BAC NET GATEWAY <br /> PROVIDE HIGHEST O BAC NET ANALOG DIGITAL ANALOG DIGITAL 3-PT ALARMS PERMIT SET <br /> AVAILABLE 7 DAY <br /> COMPATIBLE PROGRAMMABLE <br /> THERMOSTAT o o k : - Our difference <br /> E B 0 w F- z Q I is engineered. <br /> r z O i- J U <br /> Q A N cc o m 0 o o o >- w Z www.harrisgroup.corn <br /> DESCRIPTION U N N w v~) � ! :I- <br /> wo l; > O� ¢ w oo z ce rn o w w =IE d x g = U cn o o -� > to -' o I , I t .z w t- Q tY ¢ Q �' rn C) z z to w ,s,. v rP C 1- ui r I•- I-- 7-, <br /> 8 I-- I- r- O U oa cn t- w w `a p Z `n I-- ¢ z 8'' CU-1 AND FC-1 E o � � � Uwwz } Ivo w � U � � = U PROJECT NO: 0070298.00 <br /> 75. <br /> O �� _ DISTECH 0 T Q a z ¢ Z Z w Z cn 0 Zw z a u� -� z w w Z = CC <br /> APPLICATION NTS T a = oa cn w Y `n = = w d can v ui a t¢i " o (� <br /> W Cn O Cn fV P U w O -t w J . i2' to Ip <br /> OSA w m M o ce CC a IX M 0 CC w OO < (0(� 1- M > a Ce O = z > _ z <br /> F- a = 2 LL U i U Q L_ U <L (7) C11 O U) 0 > Cn Cl) O J O w 0_ 0 > = J = m W LL U O = <br /> TEMP SPECIFIC w _ w ¢ a _ ¢ w z p a z ¢ O - <br /> - CONTROLLER <br /> VRF SYSTEM <br /> REGISTRATION STAMP: <br /> BAC NET CONNECTION X �- -- - - -- - --- ---T-- <br /> _ <br /> 0 0 <br /> ERV-4 , <br /> ROOM TEMP CHILDRENS ACTIVITY X <br /> CHILDRENS DATAt,°I:7N • <br /> ACTIVITY ROOM TO ROOM TEMP DATA ROOM X X a► ; <br /> OSA TEM X � �, <br /> Jr <br /> DISCHARGE AIR TEMP X <br /> DUCT THERMOSTAT SCR ELECTRIC HEATER X <br /> A <br /> TO CONTROL SCR OSA FAN X I <br /> . Nil. <br /> J I <br /> • CONTROLLER <br /> EXHAUT FAN X <br /> EA DAMPER X PROJECT IDENTIFICATION: D <br /> OSA DAMPER X <br /> 03 DUCT HEATER 1-3 <br /> NTS Evergreen Branch <br /> ° <br /> i <br /> t . O SA9 0 LibraryExpansion <br /> FOR <br /> ERV-4 <br /> Q \--DH-4 City of Everett <br /> IL -�° EAin. <br /> AT - <br /> 0 ERV-4 9512 Evergreen Way <br /> NTS Everett WA 98204 <br /> BID SET <br /> 2015 Washington State EnergyCode Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 2015 Washington State EnergyCode Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 <br /> 9 P 9 P� This drawing is: <br /> C <br /> 1. Copyright 2017 Dykeman, Inc. C <br /> 2. The Architects Instrument of Professional Service. <br /> Mechanical Summary 0330=3 Economizer,Exceptions MECH-ECONO Economizer,Exce tions7cont. MECH-ECONO 3. For use on this project only.Obtain Architects <br /> p Mechanical Fan-System'Power Allowance MECH-FANSYS=SUM written permission for any other use or reproduction. <br /> 2015 Washington State Ener Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> 9 9Y 9 rgY P 9 2015 Washington State Energy Code Compliance Forms for Commercial B d gs g ry <br /> Project Information Project Title: Evergreen Branch Library Expansion for City of Everett Date 8/13/2018 Project Title: Evergreen Branch Library Expansion for City of Everett Date 8/13/2018 Protect Title: Date 8/13/2018 2015 Washington State Enerav Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Title: Evergreen Branch Library Expansion for City of Everett Date 8/13/2018 P ROJ ECTi U M B E R: <br /> Applicant information. Provide contact information for Individual who can respond to For Building Dept.Use For Building Dept.Use ECONOMIZER EXCEPTIONS-NEW CONSTRUCTION AND ADDITIONS,CONTINUED <br /> inquiries about compliance form Information provided. All cooling systems shall be configured to provide air economizer operation,regardless of For Building Dept.Use <br /> Company Name: Harris Group system capacity,for new construction and mechanical system alterations.Various exceptions toECo Economizer Exp 10 Cooling equipment for dedicated server,electronic equipment or Compliance Cooling <br /> this requirement are available. Identify all systems that an economizer exception will be applied telecom switch rooms.Per building limit for this exception is 240,000 System ID Capacity 201 7-008 <br /> Company Address: 20201 Cedar Valley Rd,Lynnwood,WA 98036 to and additional information as noted below. Exception Btu/h cooling capacity or 10%of required building air economizer Option (gtulh) <br /> Applicant Name: Chris Wright capacity,whichever is greater.Part load control required over 85,000 CU-2/AHU-1 Option a 36,000 <br /> Applicant Phone: (425)774.3829 SUMMary Btu/h.Additional requirements apply. p <br /> Economizer ECONOMIZER EXCEPTIONS-NEW CONSTRUCTION AND ADDITIONS Lighting+ o <br /> Option a-Cooling equipment efficiency shall be 15%better than HVAC Air Distribution System Schedule REVISIONS: <br /> Project Description ❑New Building Building Addition ❑Tenant Improvement System Retrofit ❑Ne System Changes <br /> ExceptionExp equipment g spacesprovidedy requiredefficiency.. List all HVAC systems that have the capability to provide heating and/or cooling to the spaces they serve. - <br /> 1 P 1 Coolinga ui rent servin that am with a dedicated outdoor System ID Equipment the WSEC minimum <br /> Briefly describe mechanical systems in ADDITION OF(2)VARIABLE REFRIGERANT SYSTEMS WITH(4)DEDICATED OUTDOOR AIR SYSTEMS P air system(DOAS)per C403.6.Spaces served shall have year-round design Loads(W/sf) Option b-Waterside economizer required.Cooling equipment efficiency <br /> the text box provided AND ELECTRIC DUCT HEATERS.ADDITION OF 1 3 TON DUCTLESS SPLIT SYSTEM WITHOUT Summary cooling loads from lights and equipment loss than 5 watts per square foot. o MARK DATE DESCRIPTION <br /> shall be /o 5 better than the WSEC required minimum efficiency. Fan Power <br /> ID Total Bldg Performance(TBP) ECONOMIZER AND 15%ABOVE CODE MINIMUM AND(1)ELECTRIC WALL HEATER. System or System Total Calculation <br /> 08-17-17 DD COST EST. <br /> This path includes all mandatary <br /> Option c-Waterside economizer required.All cooling equipment is Primary Supply Speed Control Description Nameplate HP Required <br /> subject to ASHARE Standard 127. Total Claimed Exempt Capacity: 36,000 Fan ID (Note 1) (Note 2) (Note 3) (Note 4) 08-17-17 DD SUBMITTAL <br /> provisions per C401.2 Option 2. <br /> MECH-SUM,MECH-CHK,and C407 Refer to Section08-14-18 PERMIT SUBMITTAL - <br /> - Energy Analysis forms required. Total building air economizer capacity(If claimed>240 kBtu/h): VRF-1 CV VRF-(9)INDOOR UNITS 0.99 No <br /> C403.3 for 09-10-18 BID SET <br /> Alternate Exp 10 Capacity Limit: VRF-2 CV VRF- 7 INDOOR UNITS 1.81 No <br /> 1] Load calculation summary 0 MECH-LOAD-CALC Form Exp 2 Single zone unitary or package systems with dehumidification that affect other System ID descriptions of ( ) <br /> Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or systems such that air economizer would increase energy consumption. economizer ECONOMIZER EXCEPTIONS-MECHANICAL SYSTEM ALTERATIONS OR REPLACEMENT System ID Alt.Strategy ERV-1 CV DOAS 0.46 No <br /> ventilating needs.if a load calculation summary Is provided with the permit documents that includes all applicable provisions and <br /> an <br /> compliance Information then the MECH-LOAD-CALC form Is not required. Refer to Section exceptions. For C503.4 Pre-approved design alternative to full compliance with air economizer ERV-2 CV DORS 0.52 No <br /> C403.3 for alterations refer Exp 1 requirement.An alternative for mechanical system alterations where existing <br /> Q Mechanical Plans ❑ MECH-EQ Forrns(TBD) to Section building constraints make full compliance with air economizer requirement ERV-3 CV DOAS 0.24 No <br /> descriptions of Exp 3 Nigh efficiency single zone unitary or packaged systems. Equipment cooling System ID 9 P q <br /> Mechanical Schedules C503.4 and Impractical.Provide calculations to the code official that demonstrate the ERV-4 CV DORS 1.2 No <br /> Indicate location of equipment compliance information.if provided on plans than MECH-EQ forms are not required, economizer efficiency shall be better than the WSEC required minimum efficiency by at P <br /> however.include on plans all applicable compliance information listed In MECH-EQ tables. provisions and least 64%in Climate Zone 4C and 59%in Climate Zone 5B per Table C403.3. Table C503.4. proposed alternate design strategy provides similar energy savings to the • <br /> exceptions. For annual energy that would be saved by the cooling system with air economizer <br /> Q DOAS Is required per C403.6 effective July 1,2017(office,retail,education,library end fire station occupancies) alterations refer per C403.3. <br /> to Section <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does not 0503.4 and Exp 4 Equipment that provides hydronic chilled water for chilled beams and System ID <br /> require space conditioning fan operation.Space conditioning fans cycled off when no heating or cooling is required. chilled ceiling systems that is served by a water economizer system per ECONOMIZER EXCEPTIONS-SIMPLE SYSTEMS Cooling <br /> Table 0503.4. <br /> Dedicated Outdoor Air 0 Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS(0403.6,Exception 1) 0403.3.4 in lieu of air economizer. C503.4 Qualifying small equipment.Per unit limit less than 33,000 Btu/h.Per System ID Capacity <br /> Exp 2 building limit for this exception is 72,000 Btu/h cooling capacity or 5%of (Btulh) <br /> System Requirements and 0 Ventilation and space conditioning provided by a HEVAV system per C403.7 In lieu of DOAS(C403.6,Exception 2) required building air economizer capacity,whichever is greater.Cooling <br /> equipment efficienc shall be 15%better than WSEC required minimum Note 1-Constant Volume(CV), Variable Air Volume(VAV),or Hospital/Lab CV system that qualifies for VAV budget per 0403.2.11.1 Exception 1. <br /> High Efficiency VAV ❑ DOAS Included in project,although not required(occupancy not office,retail,education,library or fire station) Exp 5 Water-source heat pumps with heat recovery. Heat pump efficiency shall System IDY q Single zone VAV systems shall comply es CV. <br /> be 15%better than WSEC required minimum efficiency.Provide at efficiency.Not eligible:non-unitary equipment,unitary equipment installed <br /> Alternate minimum 60%air economizer.Ener recove to preheat OSA shall outdoors or in meth room adjacent to outdoors,equipment installed during Note 2-Describe system type and list all fans(or groups of fans)associated with the delivery and removal of conditioned air by the system.Include <br /> 0 DOAS related allowances included in project 50% gY rY new construction,shell-and-core construction,or initial tenant improvement. all supply,return/relief,exhaust and exhaust hoods(>1 hp),make-up air,dedicated outside air(DOAS),booster fans,and series fan-powered <br /> have at least effectiveness.Additional system requirements apply. <br /> 0 Prescriptive vertical fenestration maximum area allowance increased to 40%per 0402.4.1.4 with 100%of terminals. VAV parallel fan-powered terminals and economizer relief fans do not need to be included if the fans do not operate at peak B <br /> B conditioned floor area In building served by DOAS. conditions. <br /> Exp 6 Cooling equipment serving Group R occupancies.Per unit limit is Cooling Total Claimed Exempt Capacity: <br /> ❑ Exception to air economizer per C403.3 Exception 1,include MECH-ECONO form. Equipment <br /> less than 20,000 Btu/h cooling capacity for equipment Installed System ID CapacityNote 3-Enter the total nameplate hp of all fans associated with the delivery and removal of conditioned air by the system. PROJECT TEAM <br /> Location Total building air economizer capacity(if claimed>72,000 Btu/h): <br /> (Btu/h) j <br /> outdoors or in a mach room adjacent to the outdoors.For cooling Note 4-This form automatically identifies whether a MECH-FANSYS form is required to demonstrate compliance with the fan power allowance(Yes), - - <br /> El Project includes HVAC air distribution systems that provide heating and/or cooling equipment installed in other locations the unit limit is less than Alternate 0503.4 Exp 2 Capacity Limit: <br /> If yes,provide a MECH-FANSYS-SUM form. 54,000 Btu/h.Efficiency shall be 15%better than WSEC required MECH-FANSYS Forms PRINCIPAL IN CHARGE: 1 RH <br /> Fan Powerminimum efficiency. C503.4 Equipment that provides hydronic chilled water for chilled water terminal Cooling <br /> A MECH-FANSYS form shall be provided for each system with total nameplate hp greater than 5 hp.Select(Add Fan <br /> For one or more systems,the total fan motor nameplate hpof all fans in HVAC system exceeds 5h of PROJECT MANAGER: I RH <br /> ❑ P• Exp 3 units.Equipment part load cooling efficiency(IPL V)shall be better than System ID Capacity System Form)to generate an additional form. Added forms can be deleted with button in cell E32 of the added form. <br /> If yes,provide a separate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. WSEC required minimum efficiency by at least 25%.Per building limit for (Btulh) PROJECT ENGINEER: I KLY <br /> Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. Ex 7 Variable refrigerant flow RFs stems with enc recovery.Outdoor unit Cooling this exception is 480,000 Btu/h cooling capacity or 20%of required building <br /> P g (VRF) y �y �' Outdoor Unit DRAWN BY: 1 XXX <br /> shall be a reverse-cycle heat pump with variable speed compressor(s)and Capacity air economizer capacity,whichever is greater.Chilled water terminal units <br /> ❑ Hydronic chilled water 0 Water-loop heat pump 0 No hydronic systems System ID serving Group R occupancies are not included in the building capacity total. _ <br /> HVAC H dromic Systems condenser fan(s).Outdoor unit cooling capacity shall be not less than 65.000 (Btu/h) <br /> O Hydropic heating water 0 Geothermal • <br /> Y Y Btu/h.Energy recovery to preheat outdoor air shall have at least 50/o rated VRF-1 144,000 K EYP LA N- <br /> 11 <br /> effectiveness.System shall be capable of providing simultaneous heating Total Claimed Exempt Capacity: <br /> and cooling by tranferring recovered energy from zone(s)in cooling mode to VRF-2 216,000 <br /> ❑ C406.2 More efficient HVAC equipment and fan systems other zone(s)that are in heating mode. Total building air economizer capacity(if claimed>480,000 Btu/h): <br /> Requires 90%of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9)or air-to-water heat <br /> pumps and heat recovery chillers.All equipment listed in fables C403.2.3(1)-(7)must be 15%more efficient than Alternate C503,4 Exp 3 Capacity Limit: <br /> minimum requirements.All stand atone supply,return,and exhaust fans over 1hp must have FEQ a 71 and must be <br /> selected within 10%of maximum total or static pressure. Exp8 Coolingequipment serv/n Controlled Plant Growth Environments. SEER,EER,& Table Compliance Options for alteration or replacement of Equipment Compliance <br /> C406 Additional Efficiencyg System 10 pexisting System ID <br /> Q C406.6 Dedicated outdoor air system(DOAS) Equipment cooling efficiency shall be better than WSEC required IEER C503.4 mechanical cooling equipment per Table C503.4. Refer to table and Type Path <br /> Options-Mechanical Requires 90%of conditioned floor area to be served by a DORS per C403.6 that delivers required ventilation air In a minimum efficiency by at least 20%.Not eligible:unitary and applied heat all applicable table footnotes for full requirements.Applies to the <br /> manner that does not require space conditioning fan operation. pumps. following retrofit conditions: <br /> 2015 WashingtOli�ta ish c er®arsrptl eiftnm rmerclal,R2 and R3 over 3 stories and all R1 <br /> - Requires 90%of floor area be in occupancy types listed in C406.7.1 and that 60%of annual hot water energy use be Option a-Any new or replacement equipment - <br /> provided by heat pump,waste heat recovery or solar wafer-heating systems. Lighting+ <br /> Exp 9 Cooling equipment with energy recovery. Spaces served shall have year- g g Option b-Replacement equipment of same type with same or <br /> round design cooling loads from lights and equipment greater than 5 watts System ID Equipment • smaller cooling output capacity. <br /> Mechanical Summa - 2 MECH-SUM per square foot.Energy recovery system shall utilize recovered energy for on Loads(IN/sf) <br /> Summary, pg -site space heating or preheating of service hot water.Provide calculations to Option c-Replacement equipment of same type with large <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 the code official that demonstrate the amount of recovered energy used for cooling output capacity. <br /> ui Type(s) on-site heating purposes is equivalent to the annual energy that would be <br /> EquipmentOption d-New equipment added to existing system or <br /> q P yPsaved by the cooling system with air economizer per C403.3. <br /> ❑ Hot water heating tank(s) 0 Instantaneous Q No service water systems replacement equipment that is different than existing <br /> Service water HeatingHeat exchange from space heat boiler or <br /> El Dedicated boiler ❑ central hot water/steam Systems • <br /> Distribution Type(s) <br /> ❑ Circulation System 0 On-demand <br /> Commissioning Commissioning Is required for: DRAWING TITLE: <br /> Q Mechanical systems per C408.2 0 Service water heating systems per C408.4 -- --- <br /> If required,commissioning shall be performed for all applicable systems regardless of individual equipment capacity. <br /> Exceptions to commissioning requirements: <br /> ❑ Total output capacity of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h <br /> A cooling or 300,000 Btu/h heating.Mechanical systems commissioning not required. A <br /> o Capacity of largest service water heating system in building does not exceed 200,000 Btulh.Service water heating O N T R O LS & <br /> systems commissioning not required. <br /> Low Energy and Semi-Heated Spaces (Note 6 and 7) ENERGY COD E <br /> Peak Space <br /> Heating Cooling Conditioning <br /> Space Area Served, Capacity,Btu/h Capacity,Btulh Capacity, Compliance <br /> Type Location in Plan(s) Space(s)Served square feet (Note 4) (Note 5) Btu/h-sf Check Notes <br /> DRAWING NUMBER: <br /> Note 4-Provide total installed heating output capacity of systems serving Low Energy or Semi-Heated space(s)in btuh. <br /> Note 5-Provide total Installed cooling capacity of system serving Low Energy space(s)in Btu/h.Not allowed for semi-heated spaces.Enter 0/f no cooling. <br /> Note 6-Refer to Section C402.1.1 Low Energy Building.!Walled peak space conditioning capacity,heating or cooling,may not exceed 3.4 Btu/h*sf. <br /> Note 7-Refer to Section C402.1.1.1 and Semi-Heated Space definition in Chapter 2.Total heating output capacity may not exceed 8 Btu/h-sf. Only systems without M42 <br /> electric resistance heating and no cooling are eligible for the well Insulation exception under semi-heated. <br /> 1 1 2 1 3 I 4 1 5 1 6 <br />