Laserfiche WebLink
Run Date: 12/6/2019 City of Everett-Public Works Department Cutoff Date: 12/6/2019 <br /> Time: 8:55 AM Contract Estimate Voucher <br /> Project: 366 For Work Order#3398A <br /> 1 Estimate#9 Contractor: INTERWEST CONSTRUCTION <br /> CLEVELAND AVENUE SEWER 609 NORTH HILL BOULEVARD <br /> SYSTEM REPLACEMENT AND STORM <br /> WATER SEPARATION <br /> WO 3398A BID:$2,767,239.54 BURLINGTON,WA 98233 <br /> TOTAL BID:$6,016,496.54 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 FORCE ACCOUNT FA 1.00 150,000.00 32,291.0200 32,291.0200 0.0000 32,291.02 32,291.02 0.00 <br /> 0002 SURVEYING LS 25,000.00 1.00 1.0000 1.0000 0.0000 25,000.00 25,000.00 0.00 <br /> 0003 SPILL PREVENTION,CONTROL& LS 600.00 1.00 1.0000 1.0000 0.0000 600.00 600.00 0.00 <br /> COUNTERMEASURES PLAN <br /> 0004 MOBILIZATION LS 240,000.00 1.00 1.0000 1.0000 0.0000 240,000.00 240,000.00 0.00 <br /> 0005 TRAFFIC CONTROL LABOR HR 55.00 2,000.00 1,962.5000 1,962.5000 0.0000 107,937.50 107,937.50 0.00 <br /> 0006 MAINTENANCE&PROTECTION OF LS 10,700.00 1.00 1.0000 1.0000 0.0000 10,700.00 10,700.00 0.00 <br /> TRAFFIC CONTROL <br /> 0007 SAWCUT PAVEMENT,FINAL JOINT CUT, LF 3.00 3,600.00 2,612.0000 2,612.0000 0.0000 7,836.00 7,836.00 0.00 <br /> UP TO 6" <br /> 0008 SAWCUT PAVEMENT,FINAL JOINT LF 1.00 900.00 5,559.0000 5,559.0000 0.0000 5,559.00 5,559.00 0.00 <br /> CUT/ADD 1"THICK <br /> 0009 ROADWAY EXCAVATION INCLUDING HAUL SY 21.00 7,500.00 7,714.3900 7,714.3900 0.0000 162,002.19 162,002.19 0.00 <br /> 0010 GRAVEL BORROW INCLUDING HAUL TN 0.01 19,200.00 11,100.9900 11,100.9900 0.0000 111.01 111.01 0.00 <br /> 0011 FOUNDATION MATERIAL TN 22.00 2,130.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0012 STREET CLEANING&SWEEPING HR 90.00 360.00 82.0000 82.0000 0.0000 7,380.00 7,380.00 0.00 <br /> 0013 TRENCH EXCAVATION SAFETY SYSTEMS LS 36,000.00 1.00 1.0000 1.0000 0.0000 36,000.00 36,000.00 0.00 <br /> 0014 CONTROL DENSITY FILL(CDF) CY 145.00 100.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0015 CRUSHED SURFACING TOP COURSE TN 52.00 300.00 217.3900 217.3900 0.0000 11,304.28 11,304.28 0.00 <br /> 0016 CRUSHED SURFACING BASE COURSE TN 31.00 4,710.00 5,415.3800 5,415.3800 0.0000 167,876.78 167,876.78 0.00 <br /> 0017 HMA CL 1/2"PG 64-22 TN 107.00 2,340.00 2,452.5300 2,452.5300 0.0000 262,420.71 262,420.71 0.00 <br /> 0018 TEMPORARY PAVEMENT PATCH(HMA) TN 150.00 410.00 160.7100 160.7100 0.0000 24,106.50 24,106.50 0.00 <br /> 0019 MANHOLE 48"DIAM,TYPE 1 EA 6,100.00 30.00 31.0000 31.0000 0.0000 189,100.00 189,100.00 0.00 <br /> 0020 MANHOLE 72"DIAM,TYPE 3(SSMH315- EA 26,000.00 1.00 1.0000 1.0000 0.0000 26,000.00 26,000.00 0.00 <br /> CONT STRUCT) <br /> 0021 MANHOLE 72"DIAM,TYPE 3(SSMH805 EA 24,000.00 1.00 1.0000 1.0000 0.0000 24,000.00 24,000.00 0.00 <br /> CONT STRUCT) <br /> 0022 DROP MANHOLE CONNECTION EA 16,000.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0023 ABANDON EXISTING MANHOLE&CATCH EA 1,600.00 4.00 8.0000 8.0000 0.0000 12,800.00 12,800.00 0.00 <br /> BASIN <br />