My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> •••• <br /> EVERETT <br /> WASHINGTON <br /> ADDENDUM NO. 3 TO <br /> 2020 TRICKLING FILTER MEDIA REPLACEMENT <br /> W.O. # UT-3742-2 <br /> MAY 21'T, 2020 <br /> NOTICE TO PLANHOLDERS <br /> Addendum No. 3 contains the following revisions, additions, deletions and clarifications <br /> and is hereby made a part of the contract documents for the above-named Project and <br /> shall be considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 3 in the space provided on page <br /> 00 4113 -3 in the Bid Form. Failure to comply with this requirement may render the Bid <br /> non-responsive and may cause its rejection. <br /> This Addendum No.3 consists of 4 pages, including all revisions, attachments and <br /> details. <br /> The Bid date for receipt of Bids not changed by this Addendum. <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 1 - SPECIFICATION 13 3000, TRICKLING FILTER MEDIA, Page 6, Section <br /> 2.2.E.2.a, First sentence. <br /> Replace the first sentence with the following: <br /> Capable of withstanding a minimum loading of 40 lbs. /sq. ft. per foot of <br /> media height above the grating as placed in the filter or 1,600 lbs. /sq. ft. <br /> (7811 kgs/m2) uniform load, whichever is greater. <br /> Addendum 2 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.