Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 27 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> compliance with these Contract Documents. Contractor remains responsible and liable for all errors, <br /> defects or a lack of quality not discovered by inspection or observation. <br /> If parts of the Work are covered prior to inspection or observation,the cost of exposing the Work for <br /> inspection and closing and re-covering shall be borne by the Contractor regardless of whether the Work is <br /> found to be in compliance with the Contract. <br /> 8.6.2. Samples of Materials <br /> The Contractor shall provide Samples or specimens of materials to be incorporated in the Work that <br /> require laboratory examination or special testing, as requested by the Owner's Representative. Such <br /> Samples or specimens shall be provided in ample time to permit making proper test analysis and <br /> examinations before the Contractor plans to incorporate the material into the Work. An independent <br /> testing laboratory will conduct tests of material in accordance with the Specifications. In the absence of a <br /> specific test requirement,the Owner's Representative will determine the appropriate standard test to be <br /> used. <br /> 8.6.3. Certification <br /> In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests,the Contractor shall provide properly authenticated documents, <br /> certificates, or other proof satisfactory to the Owner's Representative that the materials and Equipment <br /> comply with the Contract requirements. These documents,certifications, and proofs shall include <br /> performance characteristics,construction materials, and physical or chemical characteristics of materials. <br /> The Contractor shall pay all associated costs of such certification. <br /> 8.6.4. Inspection at Point of Manufacturing <br /> The <br /> Contractor shall be responsible and reimburse the Owner for the costs of inspections occurring <br /> outside of Whatcom, Skagit,Island, Snohomish,King,Pierce and Thurston counties if(a)inspection and <br /> testing of materials or Equipment in the vicinity of the Work by the Owner is not practicable,(b) the <br /> Contractor requests the Owner to inspect and test material or Equipment at the point of manufacture,or <br /> (c)the Specifications require that inspection,testing or witnessing of tests take place at the point of <br /> manufacture. Costs to be paid or reimbursed by the Contractor include,but are not limited to,travel, <br /> subsistence, labor and lodging expenses of the Owner's inspector. <br /> 8.6.5. Testing and Commissioning of Completed Work <br /> Testing and commissioning of all mechanical, electrical, and instrumentation systems and completed <br /> portions of the Work,functioning as a completed system and the complete Project,functioning as a <br /> completed facility, shall be done in accordance with the Specifications. <br /> 8.6.6. Storage of Materials and Equipment <br /> Contractor shall store materials and Equipment so as to insure the preservation of their quality and fitness <br /> for the Work. Stored Equipment and materials shall be located so as to facilitate inspection. The <br /> Contractor shall be responsible for damages, loss or casualty occurring to materials and Equipment until <br /> Final Acceptance. <br /> 8.6.7. Manufacturer's Directions <br /> Manufactured articles,material and Equipment shall be transported, stored, applied, installed, connected, <br /> erected,adjusted,tested,operated and maintained as recommended by the manufacturer,unless otherwise <br /> specified herein. Manufacturer's installation instructions and procedures shall be provided to the Owner <br /> prior to installation of the manufactured articles,material and Equipment. <br /> 8.7. DEFECTIVE WORK <br /> 8.7.1. Correction of Defective Work <br /> When,and as often as the Owner's Representative determines through his or her inspection procedures, <br /> material,Equipment or workmanship incorporated in the Project do not meet the requirements of the <br /> 00 7200 - 27 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.