My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 36 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> Overhead by the number of days of project extension caused solely by the Owner. This results in <br /> the Gross Amount of Additional Home Office Overhead Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br /> additional contribution for Overhead received by the Contractor on any Change Orders that are <br /> being presented and resolved concurrently with the subject calculation for Unabsorbed and/or <br /> Extended Home Office Overhead. The necessary adjustment would be to reduce the Gross <br /> Amount of Additional Home Office Overhead Compensation by any additional compensation for <br /> Overhead included in any direct cost claims being resolved concurrently with any claim for <br /> Extended and/or Unabsorbed Home Office Overhead. <br /> Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.6. FORCE ACCOUNT <br /> If Work or materials are to be paid for by Force Account,payment amounts will be determined and <br /> Contractor shall contemporaneously prepare, keep and maintain records segregated and allocated by time, <br /> location and item of Work in compliance with this subsection. Such records must be contemporaneously <br /> countersigned by the Owner or the Owner's Representative(or its designee). Any records not <br /> countersigned by the Owner or Owner's Representative shall be excluded from the calculation of payment <br /> under this subsection. <br /> The payments provided for herein shall be full payment for all Work done on a Force Account basis. The <br /> payment shall be deemed to cover all expenses of every nature,kind, and description, including all <br /> Overhead expenses,profit, occupational tax and any other Federal or State revenue acts,premiums on <br /> public liability and property damage insurance policies, and for the use of small tools and equipment for <br /> which no rental is allowed. <br /> No Contract Claim for Force Account shall be allowed except upon written order by the Owner's <br /> Representative for Extra Work prior to the performance of the Extra Work.No Extra Work shall be <br /> construed as Force Account Work that can be measured under the Specifications and paid for at the unit <br /> prices or lump sum named in the Contract. <br /> The Owner's Representative shall compute the amount and costs of any Work to be paid by Force <br /> Account, and the amount certified by the Owner's Representative shall be final as provided in 3.2. <br /> OWNER'S REPRESENTATIVE. <br /> The Contractor's wage,payroll, and cost records pertaining to Work paid for on a Force Account basis <br /> shall be open to inspection or audit as provided in ARTICLE 17.AUDITS. <br /> 9.6.1 Labor. <br /> The Owner will reimburse the Contractor for labor and for supervision by foremen dedicated solely to the <br /> particular Force Account item of Work,but not for supervision by general superintendents or general <br /> foremen. The Owner's Representative will compute the labor payment on the basis of these four factors: <br /> 1. Weighted Wage Rate. The Weighted Wage Rate combines: <br /> a. the current basic wage and fringe benefits the Contractor is required and has agreed to pay, <br /> b. Federal Insurance (FICA), <br /> Compensation P ( ), <br /> c. Federal Unemployment Tax Act(FUTA), and <br /> d. State Unemployment Tax Act(SUTA) <br /> A Weighted Wage Rate shall be computed for each classification of labor used. This rate shall <br /> reflect the Contractor's actual cost. It shall neither exceed what is normally paid to comparable <br /> labor nor fall below the minimum required by 7.1.WAGES OF EMPLOYEES. If the Owner's <br /> Representative authorizes overtime,the Weighted Wage Rate shall be determined on the same <br /> basis. <br /> 00 7200 - 36 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.