My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 46 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> The Owner and the Contractor shall not be responsible to compensate each other financially for <br /> any Delay to the extent caused by a Third Party or a Force Majeure Event. A Delay caused by a <br /> utility's failure to provide service or relocate its lines(despite a timely request for such service or <br /> relocation)is an example of this kind of Delay for which neither the Contractor nor the Owner is <br /> financially responsible to the other. Mislocated utility lines or utility lines not located are another <br /> example of a Delay for which neither the Contractor nor the Owner is responsible to the other. <br /> However,the Contractor's failure to request a utility locate or relocation in a timely way is not, <br /> and any resulting Delay would be the responsibility of the Contractor. Because the Contractor is <br /> responsible for ordering materials and Equipment, Contractor shall not be entitled to an <br /> adjustment of Contract Time or Contract Sum due to Delays caused by the lack of materials or <br /> Equipment. A sliike,job action, slowdown,work to rule, or other job action or labor dispute or <br /> problem is not a Delay caused by a Third Party for the purposes of section 12.4.3 Delays. <br /> 12.4.3.4.2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for Delays to the extent caused <br /> by a Third Party or Force Majeure Event. Extension of Contract Time shall be determined <br /> pursuant to 5.2.2.2 Extensions of Contract Time. <br /> 12.4.3.5 Extended or Unabsorbed Overhead <br /> 12.4.3.5.1 General <br /> To present a request for additional compensation for Extended or Unabsorbed Overhead,the <br /> Contractor has the burden of keeping and maintaining accurate documentation to support any such <br /> claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br /> Eichleay calculation, Contractor waives and releases any claim for Unabsorbed or Extended <br /> Overhead. In presenting any claim under this section of the Contract,the Contractor agrees to provide <br /> to the Owner any and all financial data needed by the Owner, or its representative,to review, <br /> substantiate and evaluate any claim for Extended and/or Unabsorbed Home Office Overhead. Failure <br /> to provide the requested information shall constitute waiver by the Contractor. <br /> If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or Extended Overhead, it <br /> shall be calculated as provided in 9.5.3.Unabsorbed and Extended Overhead. <br /> 12.4.3.5.2 Elements <br /> Contractor shall only be entitled to an adjustment of Contract Sum for Unabsorbed or Extended <br /> Overhead if it clearly and convincingly demonstrates all of the following: <br /> 1. The Owner solely caused a delay to the Completion Date as measured by analysis of the project <br /> duration by the critical path method pursuant to 5.2.2.2 Extensions of Contract Time; <br /> 2. Because of the Delay described in subsection(A),the Contractor was forced to suspend or <br /> significantly interrupt its performance so that it was on standby or idled,and the Owner required <br /> the Contractor to be ready to resume performance on short notice. Extended time of performance <br /> of Work, such as extensions caused by changes, inefficiencies, or Extra Work, does not constitute <br /> suspension or significant interruption of performance. <br /> 3. The Contractor could not and did not use resources, including but not limited to labor,materials <br /> and equipment, standing by or idled on this or any other project for any work during the period of <br /> delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its usual seasonal Overhead costs <br /> during the period of delay; and <br /> 5. The Delay did not cause Overabsorbed Overhead in the period in which the delayed Work was <br /> completed. <br /> 12.4.3.5.2.1 Resources <br /> 00 7200 - 46 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.