Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 48 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> Contractor to an adjustment of Contract Sum or Contract Time. Unless waived by the Owner,mediation <br /> is a condition precedent to the filing of any lawsuit, action or proceeding that seeks to recover on a <br /> Contract Claim,whether in whole or in part. <br /> 13.2 CONTINUING THE WORK <br /> Contractor shall carry on the Work and adhere to the schedule during all disputes or disagreements with <br /> Owner.No Work shall be delayed or postponed pending resolution of Disputes or disagreements, except <br /> as permitted by paragraph 15.04 or as Owner and Contractor may otherwise agree in writing. <br /> 14. TIME LIMITATIONS AND JURISDICTION <br /> The parties intend that all Claims and Disputes be dealt with promptly and expeditiously when they arise. <br /> The parties intend that all Claims and Disputes be resolved quickly and expeditiously and desire to avoid <br /> claims and Disputes that relate back to events or Work occurring months before. The parties desire to <br /> avoid litigation and the costs and expense of Claims and Disputes at the end of the Project. <br /> Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or Contract Claim <br /> of any kind whatsoever,must be submitted, if at all,to the Owner or Owner's Representative no later than <br /> thirty(30)days after Notice was first required to be given by the Contractor as provided in ARTICLE <br /> 10.NOTICE TO OWNER. Failure to submit a Contract Claim within the thirty(30)days of the date <br /> Notice was required pursuant to ARTICLE 10.NOTICE TO OWNER constitutes a complete waiver of <br /> and bar to the Contract Claim, and Contractor is estopped from later asserting a Contract Claim or seeking <br /> any relief or remedy relating to the Dispute for which it failed to submit a Claim. <br /> Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever against the Owner <br /> on any Contract Claim or Dispute after the expiration of one hundred eighty(180)days from Physical <br /> Completion. <br /> Any alleged cause of action by Owner or Contractor as to any acts or failures to act occurring prior to <br /> Substantial Completion shall be deemed to have accrued in any and all events not later than such date of <br /> Substantial Completion. <br /> 15. LIABILITY AND INSURANCE <br /> 15.1 GENERAL <br /> Contractor bears all risk of loss,casualty or damage to installed Work prior to Final Acceptance, <br /> irrespective of whether the Owner has taken possession of the Project in whole or in part and <br /> notwithstanding the existence or availability of insurance or the insurance coverages required by the <br /> Contract Documents. <br /> 15.2 BONDS <br /> 15.2.1 Payment and Performance Bonds <br /> The Contractor shall provide a payment and a performance bond, each in the amount of 100 percent of the <br /> Contract Sum in the form required by the Contract. This bond shall serve as security for the faithful <br /> performance of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bond shall be issued by a corporation duly <br /> and legally licensed to transact surety business in the State of Washington. Such bond shall remain in <br /> force throughout the period required to complete the Work, and thereafter for a period of three hundred <br /> sixty-five(365)calendar days after Final Acceptance. The bond must be executed by a duly licensed <br /> surety company,which is listed in the latest Circular 570 of the United States Treasury Department, as <br /> being acceptable as surety on federal bonds. No surety's liability on the bond shall exceed the <br /> underwriting limitations for the respective surety specified in Circular 570. The scope of the bond or the <br /> 00 7200 - 48 GENERAL CONDITIONS <br />