My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2213 - 4 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> B. Item #2 - TF DOME REMOVAL AND REINSTALLATION (Lump Sum) <br /> 1. The lump sum price for Trickling Filter Dome Removal and Reinstallation <br /> shall be full compensation for all labor, tools, equipment and materials <br /> necessary for removal and replacement of the existing Trickling Filter <br /> aluminum dome in order to gain access for the replacement of the <br /> Trickling Filter Media. This Work shall include, but not be limited to, <br /> providing an approved Pick and Storage plan and the disconnection <br /> and/or removal of all items and appurtenances attached to the dome <br /> which are necessary for the safe removal of the dome structure, including <br /> items such as attachment points and supports, air piping and associated <br /> bracketry, and small electrical conduits. Work under this item shall also <br /> include all equipment and materials required to successfully remove, store <br /> and reinstall the dome structure to the fully functioning condition the <br /> complete dome structure was in prior to removal. <br /> C. Item #3 - TF EXISTING MEDIA/GRATING REMOVAL AND TF CLEANING <br /> (Lump Sum) <br /> 1. The lump sum price for Trickling Filter Existing Media/Grating Removal <br /> and Trickling Filter Cleaning shall be full compensation for all labor, tools, <br /> equipment and materials necessary for the removal of the existing <br /> Trickling Filter media and media support grating systems within the <br /> existing structure. This Work shall include, but not be limited to, the <br /> disconnection, removal and storage of portions of the rotating distributor <br /> assembly to provide access for the removal of the trickling filter media, <br /> removal and proper disposal of the protective walking surface on the top <br /> of the media, complete removal and proper disposal of the of the existing <br /> media and all associated materials, and the disconnection and removal <br /> and disposal of the existing media support grating including associated <br /> hardware and materials. Work under this item shall also include all labor, <br /> tools, equipment and materials necessary for the complete cleaning of all <br /> surfaces within the interior of the trickling filter structure such as the walls, <br /> floors, center column, media support columns and drainage troughs. <br /> Cleaning shall include all work to completely clean and dry the structure in <br /> order for any coating repair work to occur properly. Cleaning shall also <br /> include removal off all hardware and material necessary to facilitate the <br /> installation of the new Trickling Filter media grating system. <br /> D. Item #4 - REPAIR OF COATINGS AND CONCRETE (Unit Price) <br /> 1. The unit price for Repair of Coatings and Concrete shall be full <br /> compensation for all labor, tools, equipment and materials necessary for <br /> the preparation of the concrete surfaces for concrete repairs and the <br /> application of the approved coatings in accordance with the Project <br /> Specifications. Work shall include, but not be limited to, the removal of <br /> lose materials, preparation of the concrete surfaces, application of <br /> 01 2213 - 4 UNIT PRICE MEASUREMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.