My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2600 - 1 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES <br /> 1.1 SUMMARY OF MODIFICATIONS PROCEDURES <br /> A. Changes to the Work may be required due to field conditions, requests made by <br /> the City, clarifications to the bid documents, or other needs that result in a change <br /> in the cost of the work and/or change in the number of contract days per Section <br /> 00 7200-6. The changes to the work will be tracked individually as Request for <br /> Change Proposals (RFCP.). Request for Change Proposals may either be <br /> prepared as a Field Directive, or as a request for pricing prior to proceeding with <br /> the work. <br /> B. A change order will be issued for one or more RFCP's grouped into a single <br /> change order. Payment for changed work cannot be paid until the change order <br /> is finalized and approved as outlined per Section 00 7200-6. <br /> C. The Request for Change Proposal shall clearly identify all labor, material, <br /> equipment, incidentals, including subcontractor's and supplier's invoices or <br /> quotes and Contractor's timecards. A reference from the latest approved <br /> schedule shall be attached justifying any time extension request. Mark ups for <br /> all overhead, profit, bond cost, B & 0 taxes, and insurance shall be added per <br /> Section 00 7200. <br /> D. Contractor, and Subcontractors where required, shall provide a breakdown of <br /> labor costs including basic wage rates, fringe benefits, FICA, FUTA and SUCA <br /> add-ons, per Section 00 7200-9.6. Where premium time is involved, the <br /> Contractor shall provide a breakdown of costs in the same detail. <br /> 1.2 FIELD DIRECTIVE MODIFICATION PROPOSALS <br /> A. Changed conditions and/or unanticipated circumstances may require immediate <br /> revisions to Work which are essential and from which a delay would result in a <br /> time and or cost penalty to the project. When such a condition exists, the City <br /> may issue a written Field Directive to the Contractor. <br /> B. The City will provide direction for the Contractor identifying the necessary <br /> changes to be made. The Field Directive shall be identified with a Request for <br /> Change number. The Contractor will provide pricing per 1.1.C. of this section <br /> within 15 days of the completion of the work. <br /> 01 2600 - 1 CONTRACT MODIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.