Laserfiche WebLink
City of Everett 004113 - 2 <br /> 2020 Trickling Filter Media Replacement UP 3742-2 <br /> ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> 1. Mobilization and LS 1 N/A $ 3b,0oo .Do <br /> Demobilization <br /> 2 TF Dome Removal LS 1 N/A $ i1 De0 <br /> and Reinstallation <br /> TF Existing Media / <br /> 3. Grating Removal and LS 1 N/A $ , <br /> TF Cleaning <br /> 4 Repair of Coatings Sq. 50 $42,5bD .op <br /> and Concrete Ft. $5D. (xj <br /> 5 Installation of New LS 1 N/A $ -1 l`?),b c).o0 <br /> Media and Grating <br /> 6 Force Account N/A N/A $15,000.00 <br /> (Section 00 7200) — I <br /> SUBTOTAL $ '195 ca <br /> Washington State Sales $ 61-3551. o(� <br /> Tax@9.8% <br /> TOTAL BID $10'93059.00 <br /> 1 .3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid <br /> closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1 . Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds within <br /> 14 calendar days of receipt of Notice of Award in the form described in <br /> Supplementary Conditions. Commence Work within seven calendar days <br /> after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work <br /> or we fail to provide the required bonds, the Bid security shall be forfeited as <br /> damages to the Owner by reason of our failure, limited in amount to the lesser of <br /> the face value of the Bid security or the difference between this Bid and the Bid <br /> upon which Contract is signed. <br /> 00 4113 - 2 BID FORM <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />