My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/22/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
8/10/2020 11:29:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/22/2020
Council Approval Date
6/24/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Tracking Number
0002378
Total Compensation
$1,093,059.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 1 Stellar J Corporation
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 2 - SPECIFICATION 00 4113, BID FORM, Page 1, Section 1.1.A <br /> Replace the address provided with the following: <br /> CITY OF EVERETT <br /> CITY PURCHASING DEPARTMENT <br /> PUBLIC WORKS BUILDING <br /> 3200 CEDAR STREET, DOOR #5 <br /> EVERETT, WA 98201 <br /> Item 3 - SPECIFICATION 13 3000, TRICKLING FILTER MEDIA, Page 6, Section <br /> 2.2.E.1, First sentence. <br /> Replace the first sentence with the following: <br /> Provide 100% FRP support grating as indicated on the drawings, and as <br /> specified as follows. <br /> ANSWERS TO QUESTIONS SUBMITTTED FOR CLARIFICATION <br /> Q1 - Please provide the Structural information for the dome covering, including the <br /> weight. - See attached Shop Drawings for approximate dome weight <br /> Q2 - Are there pick point locations already on the dome covering for lifting? — No, <br /> there are currently no pick points on the dome. <br /> Q3 - Please provide connection details of the dome covering to the concrete walls. <br /> - See attached Shop Drawings for connection details. <br /> Q4 - Are there Safety tie-offs on the dome covering? — No, there are currently no <br /> Safety tie-offs points on the dome. <br /> Q5 - Regarding the testing of the PVC sheets for the media, is the sheet testing is <br /> to be performed on unformed sheets? - Yes <br /> Addendum 2 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.