My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
007200-4 <br /> RCW: Means the Revised Code of Washington. <br /> Samples:Physical examples of materials,Equipment,or workmanship that are representative of some <br /> portion of the Work and which establish the standards by which such portion of the Work will be judged. <br /> Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. Schedule of <br /> Values. <br /> Shall: Required conduct. <br /> Shop Drawings: All drawings,diagrams,illustrations,schedules,and other data or information,which <br /> are specifically prepared or assembled by or for Contractor and submitted by Contractor,to illustrate <br /> some portion of the Work. <br /> Shown: Refers to information presented on the Drawings,with or without reference to the Drawings. <br /> Site:Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the <br /> Work is to be performed,including rights-of-way and easements for access thereto,and such other lands <br /> furnished by Owner that are designated for the use of Contractor. <br /> Specifications: That part of the Contract Documents consisting of written descriptions of the technical <br /> features of materials,Equipment,construction systems,standards,and workmanship. <br /> Specify: Refers to information described,shown,noted or presented in any manner in any part of the <br /> Contract Documents. <br /> Subcontractor:An individual or entity having a direct contract with Contractor or with any other <br /> Subcontractor for the performance of a part of the Work. <br /> Submittals: The information required by the Contract Documents provided by Contractor to the <br /> Owner's Representative or Owner. <br /> Substantial Completion: The day on which the Owner or Owner's Representative determines the <br /> Owner has full and unrestricted use and benefit of the Project,from both the operational and safety <br /> standpoints and only minor incidental Work,replacement of temporary substitute facilities,or minor <br /> correction or repair Work.remains. Determination of Substantial Completion in whole or in part is solely <br /> at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the <br /> Contract nor shall Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> Supplier: A manufacturer,fabricator,supplier,distributor,materialman,or vendor having a direct <br /> contract with Contractor or with any Subcontractor to furnish materials or Equipment to be incorporated <br /> in the Work. <br /> Total Float:The amount of time any given activity or path of activities may be delayed before it will <br /> affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic,such as pedestrians,bicyclists,wheelchairs,and <br /> equestrian traffic. <br /> Unabsorbed Overhead:The reduction or loss of contribution to recovery of the Contractor's Overhead <br /> costs realized by the result of reduced Project or Contractor billings,or both,due to any reason <br /> whatsoever,including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the bid form. <br /> Work: Refers to the Project and the labor,materials,Equipment,supplies,services,and other items <br /> necessary for the execution,completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS <br /> The complete Contract includes: <br /> I. Federal requirements that apply to this Contract and Project; <br /> 007200-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.