Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
007200-8 <br /> to be performed by the Contractor. In either case,the cost of the work incurred by or charged to the <br /> Contractor will be included in a Change Order. <br /> 2.4. SUBMITTALS <br /> Where required by the Contract Documents,the Contractor shall submit information which will enable <br /> the Owner's Representative to advise the Owner whether the Contractor's proposed materials,Equipment <br /> or methods of work are in general conformance to the design concept and in compliance with the <br /> Drawings and Specifications,such as catalog cuts and shop,working or detail drawings. In its <br /> Submittals,the Contractor shall expressly and explicitly notify the Owner's Representative of any and all <br /> deviations from the Specifications.Without express and explicit Notice of a deviation from the Contract <br /> requirements,approval of a Submittal does not relieve Contractor from complying with Contract <br /> requirements.The Owner's approval of a Submittal did not constitute a waiver of the Contract <br /> requirements.The Owner or Owner's Representative shall respond to a Submittal within thirty(30)days <br /> of receipt. The Owner or Owner's Representative may extend this time for good cause by notifying the <br /> Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br /> may be affected by materials,Equipment,or methods of work not submitted in a timely manner so that <br /> final review can be accomplished before the affected Work is complete. The Owner shall not be <br /> responsible for Delays,inefficiencies,or any additional costs or expenses caused in whole or in part by <br /> Contractor's failure to submit required information in sufficient time for review,comment,and <br /> correction. Contractor's failure to submit required information in sufficient time for review,comment <br /> and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum <br /> or Contract Time arising out of,or related to,such a Submittal. Contractor acknowledges and agrees that <br /> it may not rely upon receiving the Owner's response to a Submittal in less than thirty(30)days,unless the <br /> Owner explicitly changes this section by a signed Change Order. Requests for information or <br /> clarification from the Contractor to the Owner shall be treated as a Submittal. <br /> 2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br /> The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br /> full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> 3. OWNER <br /> 3.1. GENERAL <br /> The Owner,and the Owner's Representative,shall have the authority to act as the sole judge of the Work, <br /> Equipment and materials with respect to both quantity and quality as set forth in the Contract. It is <br /> expressly stipulated that the Drawings,Specifications and other Contract Documents set forth the <br /> requirements as to the nature of the completed Work and do not purport to control the method of <br /> performing Work except in those instances where the nature of the completed Work is dependent on the <br /> method of performance. <br /> The Owner has the authority to act,do,perform,and make any all decisions and actions authorized by the <br /> Contract Documents,including,but not limited to,Change Orders,progress payments,Contract <br /> decisions,acceptability of the Contractor's Work,and early possession. The Owner has the authority to <br /> accept or reject requests for progress payments that have been submitted by the Contractor and <br /> recommended by the Owner's Representative. The Owner has the authority to make determinations of <br /> the acceptability of the Work. The Owner also has the authority to accept or reject the Owner's <br /> Representative's recommendations regarding retention of defective Work. <br /> 3.2. OWNER'S REPRESENTATIVE <br /> The Owner's Representative shall be satisfied that all the Work is being done in accordance with the <br /> requirements of the Contract.The Contract and Specifications give the Owner's Representative authority <br /> 007200-8 <br />