My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kirtley-Cole Associates LLC 8/11/2020
>
Contracts
>
Capital Contract
>
Kirtley-Cole Associates LLC 8/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:19:40 PM
Creation date
8/19/2020 10:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kirtley-Cole Associates LLC
Approval Date
8/11/2020
Council Approval Date
7/8/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Fire Administration Tenant Improvements
Tracking Number
0002383
Total Compensation
$1,079,334.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kirtley-Cole Associates LLC 3/8/2021 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 43 36- 1 <br /> Fire Administration Building Tenant Improvements 10-1080 <br /> SECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating,ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106)and <br /> electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the Work, <br /> Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work identified, <br /> unless Subcontractors vary with Bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails: <br /> (1) to submit as part of the Bid the names of such Subcontractors; (2) to name <br /> itself to perform such Work; or(3)to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors applies only to proposed heating, ventilation and <br /> air conditioning, plumbing, and electrical subcontractors who will contract directly with the <br /> general contractor submitting the Bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor or Bidder <br /> HEATING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or"no work"MUST be stated <br /> END OF SECTION 00 43 36 <br /> 00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.