Laserfiche WebLink
City of Everett 00 73 00-3 <br /> Fire Administration Building Tenant Improvements (Rev. A) 18-1080 <br /> B. The Contractor shall be entitled to an extension of Contract Time for Delays to the extent <br /> caused by Baseline COVID-19 Requirements. Extension of Contract Time shall be <br /> determined pursuant to 1-08.8 EXTENSIONS OF TIME. This Contract Time extension <br /> is the Contractor's sole remedy if the Contract Time in the Contract Documents is <br /> insufficient to complete the Work because of Baseline COVID-19 Requirements. <br /> C. The Contractor shall be entitled to an extension of Contract Time for Delays to the extent <br /> caused by Baseline COVID-19 Requirements. Extension of Contract Time shall be <br /> determined pursuant to 1-08.8 EXTENSIONS OF TIME. This Contract Time extension <br /> is the Contractor's sole remedy if the Contract Time in the Contract Documents is <br /> insufficient to complete the Work because of Baseline COVID-19 Requirements. <br /> • Contract Claims regarding COVID-19 Requirements applicable to the Work at <br /> any time after Bid opening that are more stringent than Baseline COVID-19 <br /> Requirements <br /> • Contract Claims relating to unavailable or delayed labor, materials, equipment or <br /> subcontractors to the extent caused by COVID-19. <br /> PART 3 -WORKING HOURS <br /> 3.1 General Contractor will be required to provide a project schedule that clearly defines <br /> each phase of work including planned facility closure(s), length of time area(s) is/are to <br /> be closed, and projected reopening of affected area(s). <br /> 3.2 Work Hours: The Contractor shall provide work schedule. Facility will be partially <br /> occupied during construction. The Contractor will have full access to facility. <br /> A. The City has established regulations for control of noise in residential zoned property. <br /> For the purpose of regulating potential disruptive or annoying noise, Ordinance No. <br /> 1556-89 states that all residential zoned land fall within Noise Control No. 1. <br /> 1. Therefore, it should be noted that under the City's Noise Ordinance, construction <br /> related noise is limited to the following hours: <br /> a. 7:00 AM to 10:00 PM on weekdays <br /> b. 8:00 AM to 6:00 PM on weekends and state recognized holidays <br /> 3.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br /> 3.4 Construction contractors are responsible for notifying subcontractors of the City's noise <br /> regulations. <br /> 3.5 (Discussion of altering business operating schedule will be determined at Pre- <br /> Construction Meeting) Other hours may be considered on a limited basis without <br /> interruption of Owner's normal operations (Owner will determine if proposed work may <br /> interrupt Owner's operations). All requests for working hours other than those stated <br /> above shall be made exclusively through the Owner's Representative. <br /> 00 73 00 - 3 (Revision A 5/14/2020) SPECIAL CONDITIONS <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />