Laserfiche WebLink
9 <br /> NEW 22 G SCUPPER WITH 6" <br /> [----- / 6.. FLANGES I U�E PRE-PRIMED BOTH <br /> SIDES BEFORE INSTALLED NEW 24 GA.KYNAR <br /> COATED GALV.SHT. <br /> �_— --"'---- MTL.COLLECTOR BOX <br /> go WITH ALL EXPOSED <br /> / <br /> --IV <br /> 3" J, 4" "I t /EDGES HEMMED <br /> IPROVIDE A 1/4"OPENING <br /> GD I \ STEEL REMOVABLE <br /> DEBRIS SCREEN <br /> / I 3" C.":— 10., <br /> NEW COPING TO fi <br /> to LAP INTO NEWD 5., �� <br /> .: i <br /> / <br /> SCI,PPER SIDES Of •Q <br /> • <br /> • CONNECT TO EXISTING <br /> DOWNSPOUT AT <br /> to BLDG.FACE <br /> -BEND DOWN 1/2" LEVEL <br /> I HEM DRIP LIP WITH LIP <br /> / J HOLD BOX TIGHT TO FASCIA <br /> FACE&CAULK JOINT <br /> - EXTEND SCUPPER FLANGE <br /> TO OF COPING NAILER <br /> PLAN VIEW ANDOP LAP WITH COPING METAL ELEVATION <br /> © SCUPPER DRAIN DETAILS <br /> SCALE: 1-1/2"=1.-0.. <br /> INSTALL WOOD SHIM FOR SLOPE OVER WOOD <br /> INSTALL NEW 3"PERLITE CANT NAILER OR EXTEND TOP CLIP TO ADD HEIGHT <br /> EXTEND TYPE VI PLIES 4"& / INSTALL NEW TWO PIECE 24 GA.KYNAR 500 <br /> 8"BEYOND TOE OF CANT COATED GALV.SHEET METAL COPINGS WITH <br /> ..wvaa NEOPRENE WASHER SCREWS AT 24"O.C.AT BACK <br /> NEW TWO PLY TYPE VI 1, 4" J, 4" - <br /> PLIES&GRAN.SBS CAP 1 �'! n INSTALL ICE/WATER OVER PLYWOOD <br /> /ii: �� NAILERS-SHIM&LAP DOWN FACE <br /> NEW 1/2"TAPERED G.--4 <br /> CRICKET WITH 3/4" `'ice��� SECURE 22 GA CONT.GALV.CLIP <br /> PERLITE TOP ;:,:,•,_;,.,,.-.:,_.•,_:,,.,- -„,- -.,,:;.,c ;_,_.;ci:;.;=_; ;e;;±s''. �I / <br /> � '. WITH SCREWS AT 18”O.C. <br /> si�i�i�i�i�� ii ��i��i� o <br /> ` el' <br /> EXISTING 518" �;i •• ' MI <br /> TPWD DECK - � A / fil►i�i�1,�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i�i41►�i�i�i rsT11 1 REMOVE FULL <br /> �i //ill/,j/.4 ; EXISTINGCANT <br /> 2 X 6 / AND COPINGS <br /> ::IG <br /> / /............. 2 <br /> VI\J ' . . . . SECURE 2X4 NAILER WITH <br /> 10"B S #10 X 2-1/2"LAG SCREWS <br /> AT 12"O.C.STAGGEMPL <br /> OF EVERETT <br /> ., QED FOR PERMIT <br /> 4X16PURLINS AT8FTO.C. ' ' ' EXIS <br /> TILT-UP WALL PANELS <br /> SUSP.CEILING BELOW COPING SECTION <br /> O SCALE: 1-1/2"=1'-0" <br /> (;)9 <br /> AIRPORT RD. BUSINESS PARK a ROOF ENGINEERING DRAWING NO. <br /> ROOF REPLACEMENT •'-- - TECHNOLOGIES/ LLC <br /> COPING DETAILS DRAWN BY: M.W.JONES,P.E. (206-817-8161) R2 <br /> ADDRESS: 11627 Airport Road,Everett,Wa.98204 DATE: 2-21-2020 REVISION: 0 <br />