f IIII IIIIII IIIII <br /> To:Clover Schuler<clover@magelliAlcPchitects.com>;Tina Koch<tina@magellAlilr hitects.com> <br /> Subject: RE:City of Everett Permit Services:840 N Broadway(B1810-012)-Second Building Review <br /> Clover, <br /> Comment 6 is still an issue; see below. The other comments have been addressed. <br /> 6. Sheet A0.4A includes an estimate for the accessibility improvements. Based on the work estimate of$17,800,the <br /> accessibility improvements must be at least$3,560($3,000 if the total budget with improvements remains at <br /> $17,800). Please address the following comments: <br /> a.Confirm that the accessibility improvements are included in the previously-provided cost estimate (i.e., <br /> $17,800). Otherwise,the accessible budget and work estimate shall be increased. <br /> b.The fourth bullet indicates accessible panic hardware costing$1,850. This item is not within the intent of the <br /> code. Panic hardware and its installation is inherently accessible. Providing hardware on new or existing doors due to <br /> the project scope is a basic code requirement and not being performed to improve accessibility. This would only satisfy <br /> the requirement if the project were replacing existing panic hardware that was somehow not meeting requirements for <br /> accessibility,which has not been indicated for this project. This line item shall be removed. <br /> c.The third bullet indicates rehanging an existing door to be accessible,which is within the intent of the <br /> code. However,the estimate appears high. This is noted for your information only. As stated previously,we generally <br /> do not perform a detailed review of the cost estimate, but do review it for order-of-magnitude to verify it is <br /> reasonable. It is the applicant's risk of being subject to federal action if the final cost cannot confirm the <br /> estimate. Again,this is provided for your information only;further response on this line item is not required. <br /> d.As previously stated,the restrooms on the First Floor do not appear to provide the minimum width per ICC <br /> A117.1-09 Figure 604.9.2. The fifth bullet appears to state that the existing non-compliant restrooms cannot be <br /> modified due to space constraints. However, it is possible to modify the restrooms by moving the west non-structural <br /> partition walls. Alternatively,the bathrooms do not require the second sink and could be modified to be <br /> accessible. Therefore,the bathroom modifications do not meet the definition of being infeasible per Section 705.1.9. <br /> CELEBRATINGDrew Martin,P.E.,S.E. <br /> 1125 Associate Engineer—Commercial Plans Examiner I Permit Services <br /> YEARS 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/permits I Facebook 1 Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From:Clover Schuler<clover@magellanarchitects.com> <br /> Sent: Friday, February 8, 2019 1:30 PM <br /> To: Drew Martin<dmartin@everettwa.gov>;Tina Koch<tina@magellanarchitects.com> <br /> Subject: RE: City of Everett Permit Services:840 N Broadway(B1810-012)-Second Building Review <br /> Importance: High <br /> Drew- <br /> Please see the revised drawings that address the comments below. Please let me know if these are acceptable to <br /> formally resubmit. <br /> Thanks! <br /> Clover Schuler I Sr. Project Manager/Sr. Interior Designer <br /> �l � <br />