Laserfiche WebLink
INSPECTION REPORT / <br /> Date (Z/2 L/ (�Permit: - j ` t pV y-1 qv <br /> Itz'J— 5,50- <br /> ,5U Contractor: <br /> Owner: <br /> Site Address: 1'0161 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grou ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> retT cal Final ❑Shear Nailing GAS PIPE <br /> TE WO ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains [j Building Final� ❑Gas Pipe Final E]HWT Final <br /> OTHER OR CONSULTATION: �Z�, I__1\5--736�1!�ir i(— <br /> E] <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(42 -8881 FOR REINSPECTION—24 hour notice required <br /> Inspecto Date: <br /> EIR(10/06) IATABAR,INC. <br />