Laserfiche WebLink
INSPE TION REPORT <br /> Date !Al Pern r 6Ol l 1 7 <br /> Contractor: <br /> Owner: <br /> Site Address: z7-62,7 4ii' <br /> 67— <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> 0 -ough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> A ervice ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑7.1APPROVAL El PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED El1:1 OK FOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> C-I031-) Q.C:3- - <br /> Inspector: e/0Date: / 49 <br /> EIR(10/06) DATABAR,INC. <br />