My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 12TH AVE W THE WINSLEY 2020-08-28
>
Address Records
>
12TH AVE W
>
9900
>
THE WINSLEY
>
9900 12TH AVE W THE WINSLEY 2020-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2020 11:29:03 AM
Creation date
8/28/2020 11:28:03 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH AVE W
Street Number
9900
Tenant Name
THE WINSLEY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/16/2019 City of Everett Page V <br /> 7:11:41A1Y1 <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1902-005 Site Address 9900 12TH AVE W <br /> Applied 2/15/2019 Applicant Lot <br /> Approved 4/22/2019 Owner BREIT TA MF WALDEN POND LLC Block <br /> Issued 5/9/2019 Contractor KURKOV CONSTRUCTION LLC Tract <br /> Parent Permit No. Description TENANT IMPROVEMENT TO PUBLIC AREAS OF MULTI-FAN <br /> Notes ENLARGE EXERCISE RM,ADD PACKAGE CONCIERGE AREA,UPGRADE FINISHED& <br /> BATHROOMS,REDUCE 2ND FLOOR DECK <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 6/12/2019 6/12/2019 BLDG KMK OTHER 206-549-9669 Fedor <br /> 01-CONSULTATIO <br /> (6/12/2019 1:42 PM KMK) <br /> 60"is required for ADA as discussed. <br /> 6/17/2019 6/17/2019 BLDG DWF APPROVAL <br /> 02-FOOTING/SETB 2-footings,ok for concrete when <br /> contractor completes installation of rebar. <br /> Note: Special inspection by Mayes Testing. <br /> Provide a final letter of inspection at <br /> Building Final. <br /> 8/1/2019 8/1/2019 BLDG DWF APPROVAL see notes 7/30/2019 3:54 PM KURKOV <br /> 08-FRAMING CONSTRUCTION LLC <br /> Morning inspection if possible.Please call <br /> 30 minutes ahead of arrival. <br /> Contact Name:fedor bokov <br /> Site Address:4701 72nd ave <br /> Phone:2065499669 <br /> e-Mail:fedor@kurkov.com <br /> (8/1/2019 10:53 AM DWF) <br /> Approved subject to -Electrical RI sign off <br /> before cover <br /> 8/15/2019 8/15/2019 BLDG DWF APPROVAL eTRAKiT Inspection 8/14/2019 5:50 PM KURKOV <br /> 08-FRAMING Request CONSTRUCTION LLC <br /> Electrical is passed. Just need the ok for <br /> the insulation to start. <br /> Contact Name:fedor bokov <br /> Site Address:9900 12th AVE W everett WA <br /> Phone:2065499669 <br /> e-Mail:fedor@kurkov.com <br /> 8/16/2019 8/16/2019 BLDG DWF APPROVAL eTRAKiT Inspection 8/15/2019 4:44 PM KURKOV <br /> 11-INSULATION Request CONSTRUCTION LLC <br /> Key is on top of light fixture in the right by <br /> the entrance door. <br /> Contact Name:fedor bokov <br /> Site Address:9900 12th AVE W everett WA <br /> Phone:2065499669 <br /> e-Mail:fedor@kurkov.com <br /> (8/16/2019 9:33 AM DWF) <br /> Ok to cover <br /> INSP12 <br /> CSYSTMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.