My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE 2020-08-28
>
Address Records
>
12TH DR SE
>
6200
>
6200 12TH DR SE 2020-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2020 1:12:15 PM
Creation date
8/28/2020 1:11:18 PM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/25/2020 Page <br /> City of Everett <br /> 10:44:16AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1811-036 Site Address 6200 12TH DR SE <br /> Applied 11/5/2018 Applicant Lot <br /> Approved 11/20/2018 Owner BERKSHIRE HOUSING LLC Block <br /> Issued 11/21/2018 Contractor A&R SOLAR(ELEC) Tract <br /> Parent Permit No. B1811-004 Description ELECTRICAL TO INSTALL 222.84 KW PHOTOVOLTAIC SYST <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 11/27/2018 11/27/2018 ELEC 01-GROUND TRA APPROVAL <br /> WORK <br /> 11/29/2018 11/29/2018 ELEC 03-ROUGH TRA APPROVAL Risers <br /> IN <br /> 2/21/2019 2/21/2019 ELEC 09-FINAL SKB OTHER Consultation. 206-290-2619 Mike <br /> 4/11/2019 4/11/2019 ELEC SKB NOT READY eTRAKiT Inspection 4/10/2019 11:50 AMAAND R(DON'T <br /> 03-SLAB/CONDUI Request USE)SOLAR CORP <br /> Cover inspection <br /> PM if possible <br /> Contact Name:AAND R(DON'T <br /> USE)SOLAR CORP <br /> Site Address:6200 12TH DR SE <br /> Phone:2067079937 <br /> e-Mail:ahoule@a-rsolar.com <br /> 4/12/2019 4/12/2019 ELEC 02-GROUND SKB PARTIAL APPR AM inspection requested <br /> WORK <br /> (4/12/2019 10:47 AM SKB) <br /> OK building to transformer and service <br /> location line side tap conduits 5 feet from <br /> building reinspection for tie in to building <br /> required. <br /> 5/23/2019 5/23/2019 ELEC 09-FINAL SKB NOT READY eTRAKiT Inspection 5/15/2019 10:09 AM AAND R(DON'T <br /> Request USE)SOLAR CORP <br /> Connecting our conductors to MDP need <br /> inspection in afternoon to enable PUD to <br /> reconnect service. <br /> Contact Name:Jason Budgeon <br /> Site Address:6200 12TH DR SE <br /> Phone:4253060832 <br /> e-Mail:ahoule@a-rsolar.com <br /> (5/23/2019 2:39 PM SKB) <br /> Install line side tap.Update or follow one <br /> line diagram.Install all labels AIC,Dual fed <br /> etc.Ground XO,grounded conduct.Install a <br /> grounding electrode system at service 2 <br /> ground rods eTc.Bond service nipples. <br /> Properly size grounded conductors from <br /> transformer.Not ready. <br /> 5/24/2019 5/24/2019 ELEC 09-FINAL SKB PARTIAL APPR eTRAKiT Inspection 5/23/2019 4:04 PM A AND R(DON'T <br /> Request USE)SOLAR CORP <br /> Corrections for connection in MDP for <br /> snoPUD to reenergize <br /> Contact Name:Andrew Houle <br /> Site Address:6200 12TH DR SE <br /> Phone:2623310485 <br /> e-Mail:ahoule@a-rsolar.com <br /> (5/24/2019 1:48 PM SKB) <br /> AIC,dual fed etc.labeling still needs to be <br /> complete.Provide updated 1 line. <br /> 5/24/2019 5/24/2019 ELEC 05-SERVICE SKB PARTIAL APPR (5/24/2019 1:48 PM SKB) <br /> Complete labeling eTc. <br /> INSP12 CRIOVS VrS <br />
The URL can be used to link to this page
Your browser does not support the video tag.