Laserfiche WebLink
8/19/2020 <br />• Technical work —Define service scenarios for each time -frame <br />and option combination <br />• Outreach —Inform public about the three proposed options; <br />gather and report on public input. <br />Timeline <br />Workshops Gather <br />�(� on future WEARE feedback <br />l� transit HERE on transit <br />options values <br />PUBLIC <br />OUTREACH m N <br />O N N O <br />N <br />Gather <br />feedback <br />on future <br />transh <br />options <br />Sharefuture <br />transit <br />options <br />results <br />SPRING/SUMMER SUMMER/FALL FALL <br />Long- <br />City <br />Technical Share <br />Range Plan <br />evaluates <br />analysis of with City <br />CITY adopted <br />transit <br />options Council <br />WORK <br />options <br />May2a2a <br />Share City Council <br />with City evaluates <br />Council transit � <br />options <br />