Laserfiche WebLink
• <br /> July 8, 2020 <br /> AGREEMENT AMENDED — DESIGN OF NEW SEWER LIFT STATION AND <br /> FORCEMAIN PIPE <br /> To authorize the Mayor to sign Amendment No. 1 to the Professional Services <br /> Agreement with CHS Engineers and David Evans and Associates, Inc. to design a <br /> new sewer lift station near Edgewater Park and a new forcemain pipe along <br /> Shore Avenue. <br /> AGREEMENT — PROCUREMENT OF DESIGN-BUILD CONTRACTOR FOR <br /> RESERVOIR 3 STRUCTURAL REPAIRS <br /> To authorize the Mayor to sign the Professional Services Agreement with Brown <br /> & Caldwell for Owner Advisor services related to procurement of a Progressive <br /> Design-Build contractor for Reservoir 3 structural repairs. <br /> AGREEMENT— FORESTRY AND WATERSHED MANAGEMENT SERVICES <br /> • <br /> To authorize the Mayor to sign the Professional Services Agreement with Roots <br /> Forestry Consulting, LLC for Forestry and Watershed Management services. <br /> Roll was called with all council members voting yes, except Council Members <br /> Moore and Bader who were excused. <br /> Motion carried. <br /> ACTION ITEMS: <br /> AGREEMENT— BIOSOLIDS TOLLING <br /> Moved by Council Member Vogeli, seconded by Council Member Murphy, to <br /> authorize the Mayor to sign the Biosolids Tolling Agreement. <br /> 202 <br />