My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2820 TERMINAL AVE 2020-09-04
>
Address Records
>
TERMINAL AVE
>
2820
>
2820 TERMINAL AVE 2020-09-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 10:46:31 AM
Creation date
9/4/2020 10:45:53 AM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
2820
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> r <br /> NOTES; _ — <br /> 1. THE EXISTENCE, LOCATION, AND CHARACTERISTICS OF — — — <br /> A_ CONSTRUCTION NOTES UNDERGROUND UTILITIES SHOWN ON THESE PLANS �� I <br /> -.. 0 UTILITY I HAVE BEEN OBTAINED FROM A REVIEW OF AVAILABLE <br /> OSTEEL CA RECORD DRAWINGS AND SURVEY INFORMATION. THE 1 — �� <br /> S TIONS CONTRACTOR SHALL POTHOLE OR OTHERWISE CONFIRM _ <br /> _ EXISTING CONDITIONS PRIOR TO CONSTRUCTION. <br /> OENCASE (E) UTILITY. SEE CIVIL ---- <br /> DETAILS 2. FOR TYPICAL UTILITY TRENCH DETAIL, SEE UTILITY <br /> #1 deleted REMOVE EX HYDRANT AND DETAIL SHEET. r 7 <br /> I #3 included O REINSTALL. 3. EASEMENT FOR PROPOSED HYDRANT RELOCATION TO <br /> general wording BE NEGOTIATED BY THE PORT. 7Z... ..- 4_'- <br /> #4 <br /> added to plans O CONNECTION TO EX.MAIN <br /> BY COE FORCES. <br /> I <br /> I KEY MAP <br /> SCALE: NTS <br /> 1 PACIFIC TERMINAL <br /> 1 Generally followed <br /> I this concept. Had <br /> to shift further west <br /> to get out of <br /> I q influence zone of <br /> ti track <br /> 1 (N) STORM SEWER. Come off tee with 45j <br /> 0 1 SEE DRAINAGE SHEETS (TYP) <br /> I <br /> U I © R 45 bend <br /> F- 45+22.5 or 1 1.25, <br /> whatever it t. es to <br /> = 1 We'd prefer you consider <br /> make this co nection. <br /> 1 - relocating COE water main <br /> Lu).-1 <br /> I © • rather than encasing it. Besides. <br /> w I O SDG-01 BLDG <br /> rn STA 21+61 TO 23+06 your casing alignment has a PI T-10 <br /> I BLDG W \ .. 0 145 LF that would make it impossible to <br /> 1 T_t9 �, <br /> ° pull out the existing main. 1` <br /> r! <br /> Z I _. <br /> N 0 BLDG <br /> J I N N + <br /> ____ <br /> U 8 f;_e���� N .. <br /> T-11 <br /> H <br /> a I I <br /> m 1 f oo - <br /> _ i I <br /> ___• <br /> '0 1 <br /> _ _ - - - - - - -- -- - - a - - - - - - - - - - - - -. - _ <br /> 1 _ _ — — — — — — SHIFT (E) ELEC/COMM LINE BELOW <br /> 1 UTILITY ENCASEMENT ZONE. <br /> I PROVIDE (N) CAST IN PLACE <br /> PULLBOXES AT LIMITS OF FULL DEPTH <br /> PAVEMENT CONSTRUCTION <br /> DO NOT CUT OR DAMAGE EXISTING <br /> UTILITIES. <br /> LEGEND <br /> SHIFT (E) UTILITY <br /> POE PROPERTY BOUNDARY I— I CASING PIPE 3-.' <br /> SCALE: 1"=30' <br /> DRAWING SCALES SHOWN <br /> ON 22"x34" ORA','. <br /> ,,,, PROJECT ENGINEER <br /> SCALE PORT OF EVERETT <br /> h<, <br /> C-014 <br /> Port o,f' moHoti d nichol 100% SUBMITTAL ° cN oBw ::±/::23 <br /> TERMALAIPGRADUFORC PASNOT TOUSEDFORCONSTRUCN oFuwNeGRE£NE PO°j'c7 <br /> Po Box 538 206-622-0222 NO. <br /> EVERETT WA 98206 UTILITY PLAN-AREA 3 Mr-RR- <br /> Ph 425-259-3164 PROJECT NO. 9226 <br /> NO °AIF BY RE v,Sln: SHEET NO 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.