Laserfiche WebLink
4, PROJECT I=MTING FROM DEVELOPME TTECHNICIAN <br /> (Public Works / Permit Services) <br /> Routed Date: 11/21/2016 <br /> Permit#: PW1611-028 <br /> PROJECT ADDRESS: 2820 TERMINAL AVE <br /> DESCRIPTION OF WORK: PHASE II-MARINE TERMINAL RAIL UPGRADES-PORT OF EVERETT <br /> PLANNING REFERENCE#'s(if applicable): <br /> PRE-APP MEETING #: <br /> LAND USE PROJECT#: <br /> PUBLIC WORKS REVIEWER: Sctbi*iA <br /> REQUEST: Please review the attached material for your area of concern and return any comments <br /> and/or redlines to the Public Works Rev j, er listed above. l��, <br /> ROUTED TO: T.,�J1c �v Irl t ' ill <br /> • Stormwater/Drainage: Jane Zimmerman 145 <br /> EC Traffic M'_• :ric John Wisdom/ Corey Hert/Steve Sawye %WV n � � - r�/� '�'V� �► C Oil f S� <br /> Water: Jim Spooner Tim Markham/ - Shane Cavanah W� <br /> 1g Sewer Brian Doolan Dave Voigt/Amie Roshak flaAs -to r-u i . <br /> ❑ Planning: Teresa Weldon/Grace Pollard/ Kelsey Heyd/ Kembra Landry/Steve Ingalsbe/John Jimerson <br /> ❑ Building: Meg Haley/Steve Miller/Jeff Heilman/Tony Lee <br /> ROUTED MATERIALS: <br /> J$� Plans 0 Original City Comment Letter L <br /> ❑ Traffic Control Plan "g Original City Plan Markups (-�erl be P'v at'if <br /> ❑ Drainage Report 0 Original City Drainage Report Markups cam£ hi <br /> pytml#M3') <br /> ❑ Geotechnical Report 0 SEPA Determination (for reference) <br /> ❑ Wetland Report 0 Preliminary Short Plat Approval (for reference) <br /> ❑ Arborist Report 0 Other: <br /> COMMENTS FROM REVIEWER: (Please make comments below and/or redlines on plans) <br /> STATUS: <br /> ❑ Approved <br /> ❑ Approved as Modified <br /> ❑ Revisions Required, See Comments <br /> ❑ Review Not Required <br /> COMMENTS: <br /> 11)010 0(4 t ,( Ci -le6 i`7-Z461-(. <br /> rs O'ff IC)/IA <br /> REVISED 5/25/2016 <br />