Laserfiche WebLink
4r*-anw ENGINEERING <br /> PUBLIC SERVICES DEPARTMENT <br /> May 17, 2018 <br /> Steve Hager, PE <br /> steveh@portofeverett.com <br /> 1205 Craftsman Way, #200 <br /> Everett, WA 98201 <br /> RE: Owner: Port Of Everett <br /> Job Address: 3310 Terminal Ave <br /> Plan Check Number: B1803-043,044,045 <br /> Dear Mr. Hager, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. These comments address building issues only. Additional <br /> revisions or additions may be required by other departments (such as Building Architectural, Public <br /> Works, Planning, or Fire). All references refer to the 2015 International Building Code (IBC), the <br /> 2015 International Existing Building Code (IEBC), the 2015 International Fire Code (IFC), the 2015 <br /> International Mechanical Code (IMC), and the 2015 Washington State Energy Code (WSEC), as <br /> amended by the State of Washington and adopted by the City of Everett. The current IBC <br /> referenced standard for accessible design is the 2009 "Accessible and Usable Buildings and <br /> Facilities" (ICC/ANSI A117.1). Federal ADA regulations and standards may be more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction documents <br /> reflecting the corrections requested. All revisions require the person delivering the <br /> drawings to replace the revisions into the two sets here at our offices. For significant <br /> revisions, or if the revisions are coming directly from a document printing facility, <br /> please make arrangements with them to print and deliver two replacement sets. <br /> Architectural/Structural <br /> 1. The two structures labeled T-5A and T-5B are being relocated similarly to the main T-5 <br /> building, please structural calculations validating the lateral and gravity design of the <br /> existing structures in their new proposed location per IEBC 1302. <br /> 2. On Sheet A2, it appears that there is an aluminum stairway, landing, platform, and ramp <br /> system. Please provide stamped structural calculations and drawings for review. <br /> 3. On Sheet A2, it appears that there is a proposed holddown and building support system for <br /> these relocated structures. Please provide stamped structural calculations and drawings for <br /> review. <br /> e1of2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8857 <br />