Laserfiche WebLink
5/10/2019 Page 1 <br /> City of Everett <br /> 8:26:20AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1707-037 Site Address 3501 UPLAND AVE <br /> Applied 7/26/2017 Applicant GORDIE Lot <br /> Approved 9/18/2017 Owner GORDON HOMES LLC Block <br /> Issued 10/5/2017 Contractor GORDON HOMES LLC Tract <br /> Parent Permit No. Description NEW SFR DETACHED-LOT 3 <br /> Notes <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 10/9/2017 10/9/2017 Footing DWF Corr Reqd Not ready <br /> 10/9/2017 10/9/2017 Foundation DWF Corr Reqd Not ready <br /> 10/10/2017 10/10/2017 UFER Ground DWF Approval Contractor verified <br /> set-back <br /> 10/10/2017 10/10/2017 Footing DWF Approval <br /> 10/10/2017 10/10/2017 Foundation DWF Approval <br /> 2/26/2018 2/26/2018 BLDG DWF APPROVAL OK to cover <br /> 05-UNDERFLOOR <br /> 4/6/2018 4/6/2018 BLDG DWF PARTIAL APPR Shear wall ok to <br /> 07-EXTERIOR cover with siding <br /> 4/17/2018 4/17/2018 GAS 01-ROUGH IN SDP APPROVAL Tested at 25# <br /> 4/17/2018 4/17/2018 MECH 04-ROUGH SDP PARTIAL APPR Recall for fireplace when ready. <br /> IN <br /> 4/17/2018 4/17/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 4/17/2018 4/17/2018 PLUMB 05-OTHER SDP APPROVAL Water service OK <br /> 4/18/2018 4/18/2018 BLDG DWF PARTIAL APPR OK to insulate <br /> 08-FRAMING Note:Fireplace needs to be installed <br /> mechanical rough in sign off before <br /> complete insulation in that area. <br /> 4/19/2018 4/19/2018 MECH 04-ROUGH SDP APPROVAL Fireplace-As noted The gas pipe must be sleeved or protected <br /> IN from the metal housing or the fireplace <br /> frame-will check at final. <br /> 4/20/2018 4/20/2018 BLDG DWF APPROVAL As noted Insulation OK to cover. <br /> 11-INSULATION Provide insulation letter and blower door <br /> test at final. <br /> Note:Mechanical rough in sign off for <br /> fireplace-not installed yet. <br /> 4/20/2018 4/20/2018 BLDG DWF APPROVAL <br /> 10-INTERIOR <br /> 4/24/2018 4/24/2018 BLDG KMK APPROVAL <br /> 09-DRYWALL <br /> 5/15/2018 5/15/2018 PLUMB SDP APPROVAL Shower pan OK <br /> 03-ROUGH IN <br /> 5/31/2018 5/31/2018 GAS 03-FINAL SDP APPROVAL <br /> 5/31/2018 5/31/2018 MECH 06-FINAL SDP APPROVAL As noted The combustion air for the water heater <br /> should have a 90 degree fitting facing out <br /> instead of a straight pipe facing up where <br /> objects and debris can clog the intake pipe. <br /> 5/31/2018 5/31/2018 PLUMB 06-FINAL SDP APPROVAL <br /> 6/1/2018 6/1/2018 BLDG 14-FINAL DWF APPROVAL Need electrical final <br /> 6/5/2018 6/5/2018 BLDG 14-FINAL DWF OTHER No access 1:50pm <br /> 6/7/2018 6/7/2018 BLDG 14-FINAL DWF CORRECTION Need to insulate underfloor crawl space and <br /> install vapor barrier. <br /> 6/8/2018 6/8/2018 BLDG 14-FINAL DWF APPROVAL <br /> 6/8/2018 6/8/2018 MARK FINAL** DWF APPROVAL <br /> 2/6/2019 5/7/2019 CERTIFICATE OF TKJ APPROVAL Need planning final <br /> OCCUPANCY <br /> INSP12 CRWS YS <br />