Laserfiche WebLink
1. PROJECT OVERVIEW <br /> • <br /> This document is intended to provide engineering information necessary to support the <br /> permit application to the City of Everett for the three new SFRs and three driveways, and <br /> ROW improvements proposed for this short plat. The site is located at 3505 Upland Ave, <br /> Everett, WA 98203, refer to Figure 1 for a vicinity map. The gross short plat area is <br /> approximately 0.62 acres. The existing site contains 1 lot consisting of a SFR, gravel <br /> driveway and landscaping with a few mature evergreen trees. The slope of the site varies <br /> between flat and steep, and averages approximately 5 percent down to the west. Steep <br /> slopes are present along the northern property line. The toe of said slope is located <br /> approximately 10 feet south of the northern property line and the rise in elevation is <br /> approximately 9 feet up to the north. It is proposed that the existing site will be short <br /> platted into 3 lots of approximately equal size. The proposed new lot lines will run roughly <br /> north-south, and the new SFRs will be centrally located within each lot. The proposed new <br /> driveways will take access from the existing roadway(Upland Avenue) to the south. <br /> Each lot of this short plat proposes to construct less than 5,000 sf of new impervious <br /> surfaces with lot 2 already containing an existing SFR permitted under a recent building <br /> permit application. However, since the impervious surfaces on Lot 2 are recent they will <br /> be considered new and part of the drainage improvements for this project. The combined <br /> impervious surfaces between lots 1, 2 and 3 are over 10,000 sf. Therefore, minimum <br /> requirements 1-9 apply to all of the new and replaced impervious surfaces for this project <br /> along with all the disturbed pervious surfaces. This proposal does not meet any of the <br /> land-use criteria that require specific source control for the final use and a SWPPP has <br /> been prepared to address the runoff from the site during construction. Refer to Sections 4 <br /> and 5 for a detailed discussion. <br /> Figures 2 &3 are provided to show the existing and developed basins and runoff <br /> conditions for the three lots. The runoff from the three lots in the existing condition will <br /> spread over the pervious moderately sloped landscaping as sheet flow, to the western <br /> property line. In the developed conditions runoff generated by the proposed NPGIS will be <br /> collected and conveyed to a detention system along with the proposed PGIS and some of <br /> the landscaping along the south side of the future SFRs. The proposed detention system <br /> will discharge to an existing piped conveyance system located in the southwest corner of <br /> the site. The overall general slope of the site will not change, however, on-site grading will <br /> be required for the proposed structures. <br /> The general soil conditions for this property as mapped by the USDA Web-Soil Survey <br /> was found to be Alderwood Gravelly Sandy Loam. The hard pan for the Alderwood soil <br /> ranges between 20 and 40 inches below grade. Therefore, infiltration is not feasible for <br /> this project and other forms of flow control will be used. The drainage design has been <br /> laid out per the COE 2010 Stormwater Management Manual. <br /> Due to the size of this project Minimum requirements 1-9 apply to the proposed drainage <br /> design as noted above. Included on the following page is a copy of the MR flow chart out <br /> of the COE Drainage Manual showing how the applicable minimum requirements were <br /> determined. <br /> Uplands Short Plat 14-0108 <br /> June,2016 Page 3 <br />