My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3505 UPLAND AVE 2020-09-08
>
Address Records
>
UPLAND AVE
>
3505
>
3505 UPLAND AVE 2020-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 8:25:12 AM
Creation date
9/4/2020 1:34:30 PM
Metadata
Fields
Template:
Address Document
Street Name
UPLAND AVE
Street Number
3505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. WETLAND PROTECTION <br /> By designing the on-site improvements to increase the peak flow rates from the site by <br /> less than 0.1 cfs and by maintaining the sheet flow condition, this will provide the <br /> necessary protection to any downstream wetlands. <br /> 11. OPERATION AND MAINTENANCE MANUAL <br /> The Property Owner will be responsible for maintaining the stormwater and landscaping <br /> facilities within this development. Included in this manual are checklists for each feature <br /> specific to this project. Copies should be made of the checklists as necessary during <br /> routine inspections and required maintenance. Specific problems can be recorded along <br /> with the appropriate action taken. <br /> These checklists are a guide for inspections and maintenance. The frequency of the <br /> inspections/maintenance is identified in the left hand column with the following <br /> abbreviations: <br /> A =Annual (March or April preferred) <br /> M = Monthly <br /> S =After Major Storms (Use 1-inch in 24 hours as a guideline) <br /> Routine inspections and maintenance will improve the long-term performance of the <br /> stormwater facilities. If at any time you are unsure if a problem exists or how to address a <br /> specific problem contact a Professional Engineer. <br /> Refer to Appendix A for a.list of each facility to be maintained and the appropriate <br /> maintenance checklist. <br /> •.- i ii• - - _ 1 iii • •- • •-.Y'•• ■ - <br /> . - - - • ..- • -ss an :,:: _ • ,_ <br /> t On-site stormwater management techniques have been <br /> incorporated into the design to mitigate for this land conversion. In addition, based on the <br /> proposed improvements for the site drainage design the post developed runoff from the <br /> site is expected to mitigated and better match the existing system. Therefore, the <br /> stormwater design for this project has met or exceeded all of the applicable Minimum <br /> Requirements 1-9. <br /> Uplands Short Plat 14-0108 <br /> June,2016 Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.