Laserfiche WebLink
INSPECTION REPORT <br />Date Ioh%Permit: P — <br />Contractor: !,[h Ili <br />Owner: <br />Site Address: <br />TYPE OF INSPECTION REQUKITED <br />ELECTRICAL <br />BUILDING MECHANICA <br />PLUMBIN <br />❑ Temp Service <br />❑ UFER ground ❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundwork <br />❑ Footing ❑ Rough In <br />ough In <br />❑ Slab/Conduit <br />❑ Foundation ❑ Ceiling Grid <br />❑ Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab ❑ OK to insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing ❑ Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />❑ Insulation ❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Electrical Final <br />❑ Shear Nailing GAS PIPE <br />SITE WORK <br />❑ Roof Nailing ❑ Rough In/Service <br />Hot Water Tank <br />❑ Footing drains <br />❑ Ceiling Grid ❑ Refrigeration <br />❑ Rough in <br />❑ Roof drains <br />❑ Building( Fiinnall ❑ Gas Pipe Final <br />❑ HWT Final <br />` OTHER OR CONSULTATION: —7 ,,- �LI— 177 <br />777 <br />Z APPROVAL <br />❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />OK FOR T.C.O. <br />❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. <br />❑ VIOLATION <br />❑ <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION — 24 hour notice required <br />Inspector: � .I// Date: 0,— .. <br />El (10/06) ATABAR, INC. <br />