My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
706 VIEW RIDGE DR 2022-03-14
>
Address Records
>
VIEW RIDGE DR
>
706
>
706 VIEW RIDGE DR 2022-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 12:42:42 PM
Creation date
9/4/2020 3:54:23 PM
Metadata
Fields
Template:
Address Document
Street Name
VIEW RIDGE DR
Street Number
706
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Residential Building Air Leakage Test (Blower Door Test) Results <br />Permit#: <br />House address or lot number: -70 L Lsj Joe <br />City:Zip: c32C <br />Cond. Floor Area (f:2): Z YOD Age of house: ©tt� <br />Z�C,�— <br />Source (circle one): Plans Estimate Measured <br />Results .shall be reported as Air Changes per Hour at 50 Pascals (ACH50) and shall be calculated as follows: <br />ACH50 = (CFM50 x 60)/ Volume <br />Where: <br />CFM50 = Blower door fan flow at 50 Pascal pressure difference <br />Volume = Conditioned Floor Area of the housing unit x ceiling height <br />Blower Door Test Result: (� ACH50 <br />CFM@50Pa <br />s <br />Ring (circle one if applicable): Open B C <br />Blower Door Fan Location: T:;-,Weather Conditions: <br />I certify that these blower door results are accurate and determined using, standard industry protocol. <br />Company Name �''r �� Technician: _ J�� IR S <br />Technician Signature: Date: Phone Number: lZ` <br />2015 Washington State Energy Code reference: <br />R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not <br />exceeding 5 air changes per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 <br />Pascals). Where required by the code official, testing shall be conducted by an approved third party. A written report <br />of the results of the test shall be siened by the party conducting the test and provided to the code official. Testing <br />shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual <br />inspection has confirmed sealing (see Table R402.4.1.1), operable windows and doors manufactured by small business <br />shall be permitted to be sealed off at the frame prior to the test. <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.