My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Susan Zoccola LLC 8/28/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
Susan Zoccola LLC 8/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2021 1:39:17 PM
Creation date
9/9/2020 10:10:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Susan Zoccola LLC
Approval Date
8/28/2020
Council Approval Date
7/20/2020
End Date
12/31/2021
Department
Parks
Department Project Manager
Kimberly Shelton
Subject / Project Title
Hoyt Avenue Public Art Installation
Tracking Number
0002399
Total Compensation
$60,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Susan Zoccola LLC 11/2/2021 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> A. Project Description: <br /> The goal of this project is to create five pieces of artwork to be sited at existing light poles on <br /> Hoyt Avenue between Wall and Pacific in Everett, Washington. <br /> B. Requirements: <br /> 1. The Artist agrees that an essential element of this agreement is the skill and creativity of <br /> the Artist. The Artist,therefore,shall not assign the creative or artistic portions of the <br /> Work to another party without the consent of the City. <br /> 2. In the event that the Artist must make changes to the design during construction,the <br /> Artist shall present any changes in the scope,design,character,medium, structure or <br /> installation of the project to the City for approval. <br /> 3. The Artist will provide information to the City regarding materials and finishes to be used <br /> in the creation of the Work. Substitutions may be requested by the City in the event that <br /> the proposed materials do not comply with health and safety issues. <br /> 4. Upon completion of the Work and prior to final payment the Artist must submit the <br /> following to the City: <br /> a. Two (2)35 mm color slides and <br /> b. A care information sheet which details the materials used in and the care <br /> required for the Work; <br /> c. An Artist's statement concerning the Work that the City may use for public <br /> information purposes; <br /> d. The Artist's professional resume. <br /> 5. The Artist shall participate in a dedication ceremony. <br /> 6. The Artist shall acknowledge the City's role in funding the Work in all public <br /> presentations and written,printed or electronic publication of information regarding the <br /> Work. <br /> C. Consultation: <br /> The Artist will consult as necessary with the Kimberly Shelton Project Manager(or design <br /> staff and/or sub-consultants)in order to complete the Scope of Work specified in this <br /> Agreement. <br /> D. Art Work Description: insert here <br /> E. Technical Specifications: insert here <br /> F. Installation: insert here <br />
The URL can be used to link to this page
Your browser does not support the video tag.