Laserfiche WebLink
Project Notes X4.0 <br /> k 24-0 X X X <br /> 3 Structure <br /> 01: <br /> 3.01.01 Exterior Wall System0 4 <br /> 0 0 0Y <br /> A 5 <br /> --Mb" <br /> O <br /> New smooth "Tyvcementitious siding per <br /> 4-0 20-0 , 10-0 / 10-0 / 20-O" 4-0 <br /> elevations over'T vek"or similar / / / "� <br /> building memebrane on 7/16"CDX +20-0A _ _ _ _ __- - - - - - - - - - - - - - -- - <br /> ' Y _ <br /> plywood per struct. notes on 2x6's @ 2 - — - - - -_ _ _-__ j — _ _ _ — - —_ _ - - _ _ +20 0 — + <br /> 16"o.c.with R-21 kraft faced batt 3 Height Limit per Easement$ — — 3 Height Limit per Easemert t `fi <br /> - 3.06.01: Roof r;•,,,;' I <br /> insulation and 1/2"GWB at interior. ,r;tr"' 1 <br /> System 01 • ;;,:;::a• '•" <br /> Nailing is per shear wall schedule. I I I hr'ra ,r,,,•"•'• `.•�'•'"►•• <br /> P6 nailing unless otherwise noted. <br /> 3.02.03 Interior Furred Insulated Wall I 12 00 I I I2 .r •"'°r'`'",'•r`"", 4 I <br /> System: 3.06.01: Roof ,`�•a'••�� s 3.06.04: Over- 3.00 1000,r ,,,,•00 <br /> 2x4 studs 16"o.c.with P.T. base mP%','df• Framed RoofA•'•'`4 n •• <br /> Y4 a',r` <br /> 11016 <br /> plate held me away from concrete wall I • • ••5,••+•5;�1 ,,,v, ` •rrr ,'r . •••M <br /> @ System 01 I I '�b,,ds+,,,,,i�r,.'p,, ,.,,� •4••• �• <br /> w/R-21 kraft faced batt insulation and •••••'•'5'•'55%•,,► ,,,, ,ra I <br /> .. <br /> 1/2"GWB at interior. I •'•11,..t••. ; "r •' ' <br /> 4• <br /> 3.03.01 Wood Framed Floor System: i ' `"' '7169166=§5§10 ";,;rrr• "••',,,,,,,, <br /> 3/4"finish flooring on 1-1/8"Warmboard 5.50"X12.00"GlUlarn`= �rti-�tV114 • � ' <br /> T&G plywood on floor per Ian. ( I I I 1 O`` '�'•5••° •` •.•►'•'�yy■�••■�C►:•••►►• <br /> P yw J P p <br /> w®,xn. aaaaoa,•.a,aWanaa.+.•.•aa.,.,aa„a,�,a, aMaa „aa, ..a.y,,,..,,aaam.vaaar.4raaa.•nvaanaati.,.a..,,a..+,,,..aa„•. ,,aaaucaay+w.u. aaa.raraaar,aaa.,,uia,aaa.,,r,v, `• yr,• •�••►►'•• • • <br /> Add sound batt insulation between ,■ly4•I:,+"44Ndd•S•OA•••.6•Js'.L"m"''"”;ir''•9'dJ.'.'i••5bSL04d4ti•.9`AdJaS❖••aai�dJd•LL•ddP•'lagi4L•••id P�`i•.'AVA'd.'►••'NI '••••'.'NA <br /> floors = _ �, l' �6..... ....._ <br /> , 5.13"x24.00" Beam, GLB-BM6 <br /> 3.03.03 Wood Floor over Crawlspace :„..... <br /> L.• _ _ <br /> er <br /> 3/4"finish flooring on 3/4"T&G plywood ••• -` •I L- I _ _ <br /> on floor joists per plan with R-38 batt - — - — - ` - — - — - - — - — - — - — - — 2 Ro�$ O I O <br /> I <br /> insulation. 2 Roo I g •�I _ , _ N <br /> • Header, 3.5 lularn w/R-1D = <br /> Lin.— — ,./.iii,,', /i/t/// ,•/,/// ^ ■ - _ i"'� 5- <br /> 3.04.02 Framed Deck System: i� �l ` 1 Si <br /> 5/4x6 composite decking on floor joists : n r ' _ •T 5.50'x28.50'Glulam Beam BM5 i <br /> per plan. I I LINE OF 6'-8' HEAD I _ _ :I I <br /> 3.04.03 Deck Ledger Detail :� GLE4 NOS NCcSANCE EOVE \ I „ .. `1— I I Cit <br /> I I <br /> P.T. continuous ledger attached through �. I - <br /> sheathing to existing rim joist with •� /�' `.\ , Great ROOM 1 <br /> Simpson 1/4x3 SDS screws at 16"o.c. :� N 102 __, i 3.10.1: Railing N M <br /> staggered. Joists to be attached with 3.10.1: Railing I �• I O <br /> N 02 t > o r I II 1......... .. <br /> I System 01-• 1 cit S\101 <br /> face nailed hangers. System O1 Olt \ �' \ ,' !• <br /> 61 col I <br /> 3.05.01 Conc.slab system: I . •- -, , � ,• ( . T. <br /> 4"concrete slab with#4's @ 24"o.c. 01 <br /> _ . , �_y•" I \ Q `y �' 1.1. <br /> 3.03.01: WOOd ;+lt �,�� - il�each wa at mid-slab on 6 mil black ' 1 3.03.03: Wood Floor -171--ICIC ' a <br /> Framed Floor —=1-1 --- —, 3.04.02: "' <br /> ��II '.■�: ��■■' �rFramed <br /> Y � 11 <br /> visqueen on soil free draining gravel onI 1 - t <br /> Ilii <br /> over Crawlspace S stem: I� �le� <br /> fillm native or compacted structural I I. \ '�� I y I I.__ I�I■■1 411 1 - Deck SrSystem: '��® <br /> I II <br /> 3.05.02 Conc.slab system,Insulated: +0 1 1 _ .I. Floor .s,_ . . . .FiW • ♦♦♦♦• ,♦•�����♦. ♦ ♦�♦���♦��� ♦ ♦ ���♦ '�� �♦��� _ -s <br /> insulation on 6 mil black visqueen on 4" - �f��- - ---- t! 6I //` _�'��Wa� I +� � i ! 1 <br /> 4.4 <br /> "IR • <br /> free draining gravel on firm native soil or i • // :r' ---• •• s � � <br /> compacted structural fill. —0 / <br /> '• / F I I •tii — 3.02.03: Interior ;� 3.04.03: Deck �_t_ <br /> 2 limmi <br /> 3.05.03 Conc.slabs stem thermal break 3.04.02: Framed ' / - I '�; I <br /> :.I Ledger Detail W <br /> 414 <br /> Y I / <br /> Provide continuous P.T.2x at perimeter Deck System: __ I j• r Furred Insulated 3.= r = <br /> : G ■� f <br /> of concrete slab as a thermal break. e / / ,, •�. m y .y <br /> , ,- : <br /> �'• GrauJlspace I �_ Wall System: � 4 1 <br /> a_ <br /> Roof Systems ;lk 3.11: New Stairs ,,_ I r= — �� <br /> 3.06 <br /> • ( I ', I � �\ I 3.01.01: Exterior �� <br /> 3.08.02: Continuous • 4.02.05: GWB under �� � i • / <br /> 3.06.01 Roof System 01 /1 • stairs ,; rte"' ' I / I - - - y! \`\ ReG Room I Wall System 01: amps <br /> s (.11/0 4„)_d <br /> Standing seam metal roofing on 15 Ib Footing - 8 wall e ' =MIME \------ ��l i <br /> roofing felt on 7/16"OSB sheathing per • 1 11101 <br /> Imo, O <br /> structural notes on joists per plan. MOM <br /> •.--...,•..:•;;;.,...:::14,4014,•• • • <br /> ------ <br /> Add 3"(R-18)2.0 PCF density closed • , <br /> CI <br /> cell polyurethane spray PLUS R-21 batt ///� ,`) I ------ <br /> % / :a� <br /> or �• • • �•• �•.; ti- 3.05.01: Conc. slab .,� <br /> �/► I OSS ------ ' s stem: r 0 <br /> insulation and 5/8"GWB at interior. illaillit 01 ILO] <br /> // I y �pNo ventilation is required with this '1�- �.� . • y • I } d $------_ / / �,� 01! �I <br /> system. -10-(011"7::::: • I 111 r. <br /> Spray foam insulation is Dow Froth-Pak -10'-(0` 1 — - - —'-. - - — - - ■� - 1 - — - — 11 — - n - <br /> Ultra ICC-ESR 3568. A copy of this _ nt -1 Easemert$ i _ - r . . - <br /> I Easeme � � a � = `J, �' � I ��,. �• ?�' ..a':t� ^.... .1., � I ....':. .,.. :;; <br /> report must be provided on the job site. 3.05,03: Conc. slab <br /> .---4___ • <br /> Spray foam must be installed by a - <br /> lir <br /> certified installer. <br /> system, thermal `� • - �... t. . . � . . •.4:. <br /> • break �._ - . . • O <br /> 3.05.02: Conc. slab 3.08.02: Continuous . <br /> • <br /> 3.os.o2 Roof system o2 system-Insulated: - irr I � "�° Footing - 8" wall , . N <br /> Low Slope System: • • : • •' • <br /> 16 <br /> / ' pr 3.05.02: Conc. slab 6 .: ' " ' ' ' " • M <br /> Blandin seam metal roofing on �• • • a <br /> 9 9 tri <br /> continuous membrane substrate on • • •• • <br /> � system, Insulated: 1 j 'r"I <br /> 7/16"OSB sheathing per structural r // I • - •• ._,. <br /> notes on joists per plan. • • •• • • <br /> Add R-47 batt insulation maintaining 1" <br /> .--:' <br /> clear air space above for ventilation. • • . •• TT-4 <br /> Continuous 2"vent strips typ.atsoffts • <br /> Sectio/ 1 loo'kinc \ort�'1 • Mr <br /> 3.06.04 Over-Framed Roof 1 I / • / • V • V <br /> 2x6's©24"o.c.with 7/16"OSB 2 <br /> sheathing per structural notes. SCALE:1/4 = I'-O' <br /> ' <br /> 2x8 nailer laid flat at all connections to <br /> supporting roof. <br /> 3.08 Footings and posts <br /> Continuous and pad footing specs. ,p <br /> 3.08.)1 Continuous Footing-9"Stepdown <br /> Section y1 I Lookil yt 1c West <br /> wall — <br /> 12"x16"cont.concrete footing with SCALE:1/4 = I-O 6530 REGISTERED O <br /> #4's cont. @ mid-slab under 9"step <br /> down stem wall with#4's horiz. @ 16" <br /> o.c.and#4 L's at 18"o.c.with P.T. base <br /> plate and anchor bolt per shear wall 24'-0" k X 20'-0 X 24-0 �RCHITECT <br /> schedule. x 0., <br /> C� <br /> Provide footing drain.typ. 0 <br /> A 0 ED <br /> 0 5 A ERIC 0EDN w <br /> 3.08.02 Continuous Footing -8"wall O <br /> 8"x16"cont. concrete footing with(2) <br /> STATE OF WASH ON v <br /> #4's cont. @ mid-slab under 8"stem I j <br /> wall with#4's horiz. © 16"o.c.and#4 I <br /> L's at 18"o.c.with P.T.base plate and f <br /> anchor bolt per shear wall schedule. I 1 I 3.06.02: Roof <br /> I , System 02 v <br /> Provide footing drain,typ. <br /> 1-1 <br /> 3.08.03 Continuous Footing-6"wall I j., <br /> .1 — <br /> 8"x16"cont.concrete footing with(2) MN I I ` jli i' j l j 1 t l \ i_ _ 1.00 ( M <br /> #4'scont.@mid-slab under 6"stem 1.001 _ ■ /" �! /" " ' "/,/// ',/�/ ,,/1/ —� _ ���t I en <br /> T. <br /> wall with#4's horiz. @ 16"o.c.and#4 1 I " �rIVAcess.�sr.. ..r.�.�.a..... "Ate/ es.......-._ •:wn,.. <br /> 6.22 <br /> L's at 18"o.c.with PT.base plate and • - y, •. _ _ _ _ _ _ <br /> ♦� . 3-O 2 Roo I-O" ,11�1��I�I�I�I�AU��uTa..:..• - - — - - 00 <br /> • � �� � �••!a.•art.G,G,G,6, •'.i• eft i�ili�...r�.....ear...s...r: <br /> anchor bolt per shear wall schedule. _ _ _ �e� <br /> -.__ ♦ - 1 11111111111111 1111 11� �111111 n 111111,11111111111 � � � �1�1�1�1�1�1�I�I�I�N�uuu.•..� <br /> 00 <br /> Provide footing drain,typ. 2 Roof _ - _ _ _ _ <br /> 1022�♦�♦�paa A� - - - •PM. Header, 3.5 glUlam w(R 10 asre.o.`��rs..,.,.o-v-v...�a•..oc.r.w•..,...e:ce-••'•x •d' <br /> 3.10 Railings - � — 4.02.02: Separation <br /> 01 <br /> Ilt I <br /> • I of Gara a and ''a -� r T <br /> Railings and guardrails to be min.36" �— g <br /> tall with max.4"opening. Railings at y House <br /> •s <br /> stairs may have 6"dia.opening at the x v <br /> triangle formed by the tread,riser and • Garage + • <br /> bottom rail.Other openings at stair rail ': x Master �3ath 1 <br /> \ G-1 1- i O Office/Sed 2 \ 1"iud fRoom /� OC) <br /> • <br /> may not allow a sphere of 4-3/8 to •• I x 3.12.03: Glulam I IOS �O'� iQg 01 V/ C <br /> pass. Railing connections to be •S.'i c\v \ Header -9" <br /> designed to resist a 50 plf linear load - O O •s u , �+ <br /> applied to the railinganydirection and • <br /> • i ) ' <br /> PP �. <br /> intermediate rails to resist a 50 lb load • dJ <br /> �i I I ` 0 1 <br /> 0 <br /> V/ �■..1 <br /> applied to a 1 sf area. ►• O , ' • ILL ._ ■ ■ , v <br /> / 3.05.01: Conc. slab SLOPE CONC. • V v <br /> 3.10.1 Railing System 01 i 1 � NI <br /> •� �• \ <br /> • <br /> Premanufactured aluminum railing P.s / system: SLAB 1/8 / FOOT 1 • <br /> . /A. •^\ , v\ . <br /> system with cantilevered glass panels. • / •• • .• ^ , <br /> Base plate mounted. +o : �/ _! m _ `� i ` - . . . !e.I� ±O I ..- I \ I - — - - -- e. V�/ ��r <br /> g •5 <br /> Glass to be safety glazing and designed - 1 First Floor � <br /> with a safetyfactor of 4. c --- „ - _._ c1141411."411r � �. ♦♦ . . ....111-'..::..i. /. //. <br /> rpt Floor$ ;.,,•„,%!%:j, , . . . ®® ,M • ` `t !+41''1r11"Iri v lis i ♦v 4.1 �i v - ♦♦ ♦ �� I ' ,// �.. . ;/ <br /> 3.11 New Stairs fy �� I �.maw �.midi,�e.r■i���� ������ - ' ,I.PJ O <br /> • <br /> Stairs to have a continuous handrail at <br /> 36"above nosing. Handrail diameter to �_ 3.08.03: Continuous Crawlspace 3.08.01: Continuous Gravels ace <br /> be min. 1-1/4”and max.2"in diameter. - Footing - 6" wall '� Footing - 9" • 3.08.02: Continuous p .•a <br /> Terminate rail at newel post or security / -• Footing - 8" wall tip <br /> - <br /> • i��� • Stepdown wall , �) _ - g14 ^� <br /> terminal. I • <br /> Stairs to have min.6'-8"head clearance ( • f-1 <br /> CiltU <br /> • - <br /> above nosing. I .. 1 Z• <br /> 3.12 Structural Headers Section at C araGe �- ,1 .•,`- s,�,�.- fie`_ ,_.� . Iw • 'At/� �/� • • ,/w •�■■� N .� �l <br /> Provide jack and king stud r�/ '. Ai , ` _ ..1 <br /> 3.12.03 Glulam Header-9" SCALE:I/4 = C Y , <br /> 3 1/8x9 Glulam header with 2"(R-10) <br /> • <br /> rigid insulation unless noted otherwise. Sectio/ I Looklrc South <br /> g ._ / • <br /> • <br /> .4111111 / �� / U <br /> See also structural talcs for sizing. � -� <br /> 3.12.04 Glulam Header-10.5" SCALE:I/4 = I-0 '^ <br /> 3-118x10.5 Glulam header with V J N <br /> 2"(R-10)rigid insulation unless noted P:) <br /> C\ <br /> otherwise. See also structural talcs for Section at Office <br /> •� N <br /> sizing. <br /> SCALE:1/4 = I-0' E fl.'( <br /> 4 Safety 4-i W <br /> Requirements H <br /> 4.02 Fire Separation <br /> U <br /> 4.02.02 Separation of Garage and House <br /> Contractor to verify or provide type"X" <br /> GWB and fire-taping at all surfaces next <br /> to living areas. <br /> 1 hour separation required. <br /> 4.02.05 GWB under stairs <br /> Provide 1/2"GWB at enclosed and <br /> accessible under stair spaces. Date Issued: Sheet G <br /> **/**/0000 Number: "a <br /> 4) <br /> bA <br /> Date Plotted: U <br /> �/5/20 ,4-301 •.., <br />