Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Call for Bids for the construction of the Water Initialed by: <br /> Pollution Control Facility Maintenance Building Department Head <br /> CAA <br /> Council President <br /> LOCATION: <br /> Water Pollution Control Facility(WPCF) COUNCIL BILL# <br /> Smith Island Originating Department Public Works <br /> Contact Person Carl Baird <br /> Phone Number 425-257-8852 <br /> FOR AGENDA OF April 23, 2003 <br /> Preceding Action: XX Consent Second Reading <br /> 4/15/03 —Budget Committee Action Third Reading <br /> First Reading Public Hearing <br /> PSA Amendment No. 5 to prepare plans <br /> and specifications <br /> Department(s) Approval (Identify): <br /> Attachments: <br /> None <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 500 Account Number(s): UT-2993-21-2 <br /> Amount Budgeted $ 2,000.000 UT-2993-21-2 <br /> Additional Required $ -0- <br /> SUMMARY STATEMENT: <br /> At Everett's Water Pollution Control Facility (WPCF), the City requires a more efficient plant maintenance <br /> building that accommodates all shop, warehousing, and maintenance management functions in a centralized <br /> location to ensure that all wastewater treatment process equipment performs in accordance to the <br /> requirements of Washington Department of Ecology's operating permit. In light of the pending <br /> improvements to the treatment works over the next several years, the timing for this improvement is critical. <br /> Brown and Caldwell has competed the design of the Maintenance Building. Utilities is prepared to Call for <br /> Bids to obtain the services of a contractor to construct these facilities. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of the Water Pollution Control Facility Maintenance <br /> Building. <br />